| 0 |
| rnr_id |
650 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Quad Residence Halls |
| proj_desc |
Contribution to Renovation Project for outside ADA work and hot water infrastructure work - Phase 2 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
450000.00 |
| total_funding |
NULL |
| proj_system |
HOT WATER DISTRIBUTION SYSTEM |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
89.00 |
| rank_by_direct |
.01 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:31:19.000 |
| edited_by |
hixjame |
| funding_status |
2 - RESERVED |
| notes |
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 1 |
| rnr_id |
651 |
| fiscal_year |
FY23 |
| proj_num |
22-166 |
| bldg_name |
JC Smith Museum Of Art |
| proj_desc |
Room 031, Repair Ceiling Leak |
| design_constr |
CONSTR |
| prev_funded |
NULL |
| future_fund |
80020.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
95.00 |
| rank_by_direct |
5.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-28 14:41:49.000 |
| edited_by |
hixjame |
| funding_status |
2 - RESERVED |
| notes |
Added per Mary Park 04-21-2022, design complete, bidding FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal |
|
| 2 |
| rnr_id |
652 |
| fiscal_year |
FY23 |
| proj_num |
19-044 |
| bldg_name |
Campus Wide |
| proj_desc |
Annual Reserve Existing Building Commissioning - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
12.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-06-13 10:29:53.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
[4/11/22] loaded from U&E list
Redirected funds to 23-293 for purchase of a spare transformer |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
AR |
|
| 3 |
| rnr_id |
653 |
| fiscal_year |
FY23 |
| proj_num |
22-390 |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - Access Control Panel Upgrades Throughout AU Main Campus - PHASE IV |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
13.00 |
| rank_by_direct |
.10 |
| system_rank |
1.00 |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
Bob Hix |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:12:25.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
(10/18/2016) Added at Burl Sumlin\\\\\\\'s request - total of all phases estimated at $321k. (04/14/2017) Per Burl, alloc reduced from $75k to $50k.(04-11-2022) allocation increased from $50k to $75k |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Campus Upgrade |
|
| 4 |
| rnr_id |
654 |
| fiscal_year |
FY23 |
| proj_num |
22-453 |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - Repair & Replacement Of Backflow Preventers Throughout the AU Main Campus - FY23-FY25 CONTRACT, PART 1 of 3 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
175000.00 |
| total_funding |
NULL |
| proj_system |
PLUMBING |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
21.00 |
| rank_by_direct |
.10 |
| system_rank |
1.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:12:39.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
(04/18/2018) Per Mark A, allocation increased from $75 to $125k. |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 5 |
| rnr_id |
655 |
| fiscal_year |
FY23 |
| proj_num |
22-389 |
| bldg_name |
Campus Wide |
| proj_desc |
ANNUAL RESERVE - Various Painting Services - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
109900.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
26.00 |
| rank_by_direct |
.10 |
| system_rank |
1.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-08 16:10:50.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 6 |
| rnr_id |
656 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
Not Listed |
| proj_desc |
ANNUAL RESERVE - for Small Miscellaneous Projects Throughout the Fiscal Year - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
82046.00 |
| total_funding |
600000.00 |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
49.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-06-12 09:53:40.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 7 |
| rnr_id |
657 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
Not Listed |
| proj_desc |
ANNUAL RESERVE - for Project Prioritization Program per Client Submitted Projects - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
34.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-02-02 10:57:59.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Zeroed this line after adding individual PPP projects to the list. Projects: 22-438, 22-447, 22-448, 22-430, 22-431, 22-437, 22-311
22-432, 22-082, 22-295, 22-428
22-429
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 8 |
| rnr_id |
658 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - Bathroom Renovations & Fixture Upgrades - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
14.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:14:27.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 9 |
| rnr_id |
659 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - Building Condition Assessments - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
STUDY |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
15.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:14:32.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 10 |
| rnr_id |
660 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - for Inspections of Fall Protection Systems - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
25000.00 |
| total_funding |
NULL |
| proj_system |
STUDY |
| fac_dept |
FO - Safety Management |
| fm_overall_rank |
17.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:54:12.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 11 |
| rnr_id |
661 |
| fiscal_year |
FY23 |
| proj_num |
22-341 |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - Building Pressure Washing - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
-62870.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
29.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-06-23 14:59:03.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
23-054 - $25K |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 12 |
| rnr_id |
663 |
| fiscal_year |
FY23 |
| proj_num |
22-408 |
| bldg_name |
Road |
| proj_desc |
ANNUAL RESERVE - Campus Wide - Roadway Striping For FY2 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
ROADWAYS |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
23.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-06-12 10:32:21.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
22-408 budget approved 5-26-2023, remaining annual reserve for pothole repair |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 13 |
| rnr_id |
664 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - SGA Projects - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
18.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:13:46.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 14 |
| rnr_id |
665 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - ADA Accessibility Improvements, Including Automatic Door Openers - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
25.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:13:53.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
$100K AR used as partial funding for 22-356 Cary Hall ADA. Total estimate for this project is $236K |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 15 |
| rnr_id |
666 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - Guardrail & Stairway Handrail Improvements - FY23 (ref 14-203 for Study) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
19.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:13:57.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 16 |
| rnr_id |
667 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - Various Small CAMPUS SERVICES Projects: Cleaning Of Classroom Floors And Furnishings, Grout Restorations, etc. - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Campus Services |
| fm_overall_rank |
16.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:11:41.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
(01/27/2017) Per Mark A, increased from $30k to $50k. |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 17 |
| rnr_id |
668 |
| fiscal_year |
FY23 |
| proj_num |
22-466 |
| bldg_name |
Campus Wide |
| proj_desc |
ANNUAL RESERVE - Brick and Joint Pointing |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
32.00 |
| rank_by_direct |
.10 |
| system_rank |
1.00 |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-10 07:19:30.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance List
5/8/23 - Maintenance will not use this FY. T\'fer funding to 23-138 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 18 |
| rnr_id |
669 |
| fiscal_year |
FY23 |
| proj_num |
22-462 |
| bldg_name |
Campus Wide |
| proj_desc |
ANNUAL RESERVE - Campus Wide - Elevator Door Operator Upgrades FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
150000.00 |
| total_funding |
NULL |
| proj_system |
CONVEYANCE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
22.00 |
| rank_by_direct |
.10 |
| system_rank |
1.00 |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:56:08.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance List |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
AR |
|
| 19 |
| rnr_id |
670 |
| fiscal_year |
FY23 |
| proj_num |
22-401 |
| bldg_name |
Draughon Library |
| proj_desc |
Roof Replacement & Building Envelope Sealant Repairs - CONSTRUCTION PORTION ONLY (Ref. 17-330, 21-562) Phase II+ |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
1482500.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
115.00 |
| rank_by_direct |
1.00 |
| system_rank |
1.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
Brad Johnson |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-08 16:00:18.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
(10/17/2017) Per Adam, reduced from $2M to 825k - 1/2 of roof under warranty. (12/07/2017) Per MA, $750k to $1.1M. (06/18/2018) Per MA, $1.1M to $1.3M. |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal |
|
| 20 |
| rnr_id |
671 |
| fiscal_year |
FY23 |
| proj_num |
22-457 |
| bldg_name |
Funchess Hall |
| proj_desc |
Funchess Hall - Replace Condensate & Steam Lines |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
600000.00 |
| total_funding |
NULL |
| proj_system |
STEAM DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
117.00 |
| rank_by_direct |
2.00 |
| system_rank |
3.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Ken Martin |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-08 16:02:23.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Added per U&E list, has been ongoing issue 8/15/2022 BNY |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 21 |
| rnr_id |
672 |
| fiscal_year |
FY23 |
| proj_num |
22-509 |
| bldg_name |
Haley Center |
| proj_desc |
Bldg-Wide - Fire Alarm System Upgrades (backbone through 10-042) - PHASE III ONLY (devices & mass notification. sys.) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
250000.00 |
| total_funding |
NULL |
| proj_system |
FIRE PROTECTION |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
113.00 |
| rank_by_direct |
2.00 |
| system_rank |
1.00 |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-08 15:30:51.000 |
| edited_by |
yonbenj |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance List, funding decreased from $500k to $250k based on FY22 execution 8/15/2022 BNY
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Safety |
|
| 22 |
| rnr_id |
673 |
| fiscal_year |
FY23 |
| proj_num |
22-085 |
| bldg_name |
Samford Hall |
| proj_desc |
Uplighting and Facade Lighting to LED |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
354820.00 |
| total_funding |
NULL |
| proj_system |
EXTERIOR SITE LIGHTING <12' |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
111.00 |
| rank_by_direct |
3.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-06-23 15:26:00.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance List |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Campus Upgrade |
|
| 23 |
| rnr_id |
674 |
| fiscal_year |
FY23 |
| proj_num |
22-454 |
| bldg_name |
Patterson Greenhouse |
| proj_desc |
Duncan Drive - Sanitary Sewer Replacement |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
97195.00 |
| total_funding |
NULL |
| proj_system |
SANITARY SEWER SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
110.00 |
| rank_by_direct |
3.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 16:05:26.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Added per U&E list, line has backed up and overfloed into stream 8/15/2022 BNY |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal |
|
| 24 |
| rnr_id |
676 |
| fiscal_year |
FY24 |
| proj_num |
22-409 |
| bldg_name |
Samford Av & Duncan Drive |
| proj_desc |
[UE33] Traffic Control System Upgrade & Improvements(Ref 16-372) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
350000.00 |
| total_funding |
NULL |
| proj_system |
TRAFFIC SIGNALS |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
5.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-22 15:57:23.000 |
| edited_by |
yonbenj |
| funding_status |
3 - PROPOSED |
| notes |
OUA managed - Brad Prater. 05-22-2023 May move to FY23 with College of Ed construction
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 25 |
| rnr_id |
677 |
| fiscal_year |
FY24 |
| proj_num |
22-488 |
| bldg_name |
Haley Center |
| proj_desc |
Phase 1 Replace AHU 3A (Design Portion only) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
70000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
73.00 |
| rank_by_direct |
6.00 |
| system_rank |
2.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:22:59.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance List
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 26 |
| rnr_id |
678 |
| fiscal_year |
FY23 |
| proj_num |
22-458 |
| bldg_name |
Camp Auburn Road |
| proj_desc |
Lem Morrison Dr - Replace Water Line From Woodfield Dr To Camp Auburn Rd |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
488088.00 |
| total_funding |
NULL |
| proj_system |
DOMESTIC WATER DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
112.00 |
| rank_by_direct |
6.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 16:05:58.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Added per U&E list,line has developed several leaks 8/15/2022 BNY
Buster way underestimated. $489K |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 27 |
| rnr_id |
679 |
| fiscal_year |
FY23 |
| proj_num |
22-461 |
| bldg_name |
Lambert Powell Meat Lab |
| proj_desc |
Fire Alarm - Correct issues with moisture and corrosive conditions. |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
68000.00 |
| total_funding |
NULL |
| proj_system |
FIRE PROTECTION |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
123.00 |
| rank_by_direct |
7.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-01-11 15:30:22.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance List |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 28 |
| rnr_id |
680 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Campus Wide - Utilities & Energy Mgmt |
| proj_desc |
[UE16] Storm Sewer Repairs from Nichols Center to Beard-Eaves Court to Heisman Drive - CONSTRUCTION ONLY |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
350964.00 |
| total_funding |
NULL |
| proj_system |
STORM SEWER SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
84.00 |
| rank_by_direct |
12.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:28:30.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
(05/23/2018) Per Mark A & Buster, reduced FY19 allocation from $500k to $305k.
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 29 |
| rnr_id |
681 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Hargis Hall |
| proj_desc |
Elevator - replace controls & fixtures |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
225000.00 |
| total_funding |
NULL |
| proj_system |
CONVEYANCE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
78.00 |
| rank_by_direct |
9.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:25:28.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance List, increased from $150k to $225k 8/15/2022 BNY
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 30 |
| rnr_id |
682 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Langdon Annex |
| proj_desc |
Comprehensive Building Envelope Restoration Phase 1 - First Floor Water Intrusion (ref 18-024 & 18-025 & 18-030 for prior STUDIES) - DESIGN PORTION ONLY |
| design_constr |
DESIGN |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
124.00 |
| rank_by_direct |
11.50 |
| system_rank |
4.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Brad Johnson |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-15 15:59:32.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
12/18/2018 Added to the plan as split project., updated 4-13-22 (VERIFY) |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 31 |
| rnr_id |
683 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Haley Center |
| proj_desc |
Abatement of 8th Floor |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
300000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
81.00 |
| rank_by_direct |
11.00 |
| system_rank |
2.00 |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-23 14:37:24.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance List
Moved from FY23 plan to FY24 on 3/3/23
Possibly move to FY25 and execute when COE moves out. Check with CPSM
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 32 |
| rnr_id |
684 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Haley Center |
| proj_desc |
[UE149] Installation of side-stream filtering station to clean the Chilled Water systems |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
165000.00 |
| total_funding |
NULL |
| proj_system |
CHILLED WATER DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
87.00 |
| rank_by_direct |
17.00 |
| system_rank |
6.00 |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:30:14.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
(11/8/2018) MWA created this item as a split off of Project # 17-053.
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 33 |
| rnr_id |
685 |
| fiscal_year |
FY23 |
| proj_num |
22-069 |
| bldg_name |
Upchurch Hall |
| proj_desc |
South & West Sides Dormer and Shingle Replacement |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
300000.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
122.00 |
| rank_by_direct |
3.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-01-11 15:26:16.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Plug Number 04-21-2022 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 34 |
| rnr_id |
686 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Haley Center |
| proj_desc |
2nd Floor, Restroom Renovations & Refurbishments (ref 17-153 for 1st Floor) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
200000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
77.00 |
| rank_by_direct |
9.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:24:34.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 35 |
| rnr_id |
687 |
| fiscal_year |
FY24 |
| proj_num |
21-522 |
| bldg_name |
Comer Hall |
| proj_desc |
Building Envelope Restoration (PHASED?) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
1000000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
72.00 |
| rank_by_direct |
6.00 |
| system_rank |
1.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:17:35.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Added per Mary Park 04-21-2022
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 36 |
| rnr_id |
688 |
| fiscal_year |
FY23 |
| proj_num |
22-086 |
| bldg_name |
Beard-Eaves-Memorial Coliseum |
| proj_desc |
Exterior North Side Structural Assessment and Repairs |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
21782.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
50.00 |
| rank_by_direct |
11.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:31:59.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Added per Mary Park 04-21-2022 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 37 |
| rnr_id |
689 |
| fiscal_year |
FY23 |
| proj_num |
22-073 |
| bldg_name |
O.D. Smith |
| proj_desc |
Roof Replacement, Fascia and Soffit Repairs (ref. Proj. 20-529) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
800000.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
116.50 |
| rank_by_direct |
2.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-06-26 09:02:47.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Pricing based on 2021 AUFM estimate
Richard Meinert raised to $800K, 3223
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 38 |
| rnr_id |
690 |
| fiscal_year |
FY24 |
| proj_num |
22-255 |
| bldg_name |
Cater Hall |
| proj_desc |
Roof Replacement, Fascia and Soffit Repairs (ref. Proj. 20-526) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
500000.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
70.00 |
| rank_by_direct |
4.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:15:39.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 39 |
| rnr_id |
691 |
| fiscal_year |
FY24 |
| proj_num |
22-427 |
| bldg_name |
Samford Hall |
| proj_desc |
Samford Hall - Replace AHU & FCUs & Provide New VAV System |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
1000000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
114.00 |
| rank_by_direct |
4.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-06-05 15:18:47.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance list |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal |
|
| 40 |
| rnr_id |
692 |
| fiscal_year |
FY23 |
| proj_num |
22-474 |
| bldg_name |
Haley Center |
| proj_desc |
Motor Control Centers (MCC) Replacement in 4th Floor Quads (4 small MCC\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\'s) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
350000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
116.00 |
| rank_by_direct |
8.00 |
| system_rank |
2.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-08 16:01:39.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal |
|
| 41 |
| rnr_id |
693 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Haley Center |
| proj_desc |
Phase 2 Replace AHU 3A (Construction Portion only) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
650000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
83.00 |
| rank_by_direct |
12.00 |
| system_rank |
2.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:43:13.000 |
| edited_by |
hixjame |
| funding_status |
3 - PROPOSED |
| notes |
added per Maintenance List
Changed from FY23 to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 42 |
| rnr_id |
694 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Biggio Drive |
| proj_desc |
[UE114] Replace Sanitary Sewer Line down Biggo from Softball Complex to Lem Morrison. Consider upsizing since existing line is likely 8 inch, and made from terra cotta. |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
352000.00 |
| total_funding |
NULL |
| proj_system |
SANITARY SEWER SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
86.00 |
| rank_by_direct |
16.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
Rob Engle |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:29:38.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
Added from U&E project list (04-11-2022)
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 43 |
| rnr_id |
695 |
| fiscal_year |
FY25 |
| proj_num |
future |
| bldg_name |
Foy Hall |
| proj_desc |
Foy Hall - Suite 189, Replace AHU-1 & Provide New VAV System (ref 17-331,14-056 & 16-427 for prior work) (PART 02 of 10) - CONSTRUCTION PORTION ONLY |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
450000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
19.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2022-08-16 08:45:03.000 |
| edited_by |
yonbenj |
| funding_status |
5 - FUTURE |
| notes |
(04/20/2018) Per Daniel Clarke, construction allocation reduced from $500k to $400k. |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 44 |
| rnr_id |
696 |
| fiscal_year |
FY24 |
| proj_num |
18-376 |
| bldg_name |
Foy Hall |
| proj_desc |
Building Envelope Repairs (PHASE I - Replace All Joint Sealants & Steel Windows w/ Aluminum) - CONSTRUCTION PORTION ONLY (3 potential phases - $750k, $500k, $600k) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
599350.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
74.00 |
| rank_by_direct |
7.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-23 14:10:30.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
(08/03/2018) Added per Amy Bingham.
Moved from FY23 plan to FY24 on 3/3/23
If Dining replaces windows in kitchen, replace these windows |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 45 |
| rnr_id |
697 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Beard-Eaves-Memorial Coliseum |
| proj_desc |
[UE138] Replace DSC8500 controls (can be broken into smaller parts) 3 phases $100k/ea |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
300000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
88.00 |
| rank_by_direct |
31.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:30:46.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 46 |
| rnr_id |
698 |
| fiscal_year |
FY27 |
| proj_num |
future |
| bldg_name |
Greene Hall |
| proj_desc |
AHU Replacements: Nos 38, 61, 63, 64, 66, and AHU 1 (Animal Tower, TEMT) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
140000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
45.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
5 - FUTURE |
| notes |
some AHU's replaced already under separate projects. |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 47 |
| rnr_id |
699 |
| fiscal_year |
FY21 |
| proj_num |
future |
| bldg_name |
Mell St & Roosevelt Dr |
| proj_desc |
[UE116] Replace underground HW valves |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
48000.00 |
| total_funding |
NULL |
| proj_system |
HOT WATER DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
54.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2022-08-16 13:46:42.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 48 |
| rnr_id |
700 |
| fiscal_year |
FY23 |
| proj_num |
23-100 |
| bldg_name |
Biggin Hall |
| proj_desc |
Exterior Envelope Repairs (ref. 20-417) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
17000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
65.00 |
| rank_by_direct |
10.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:44:50.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
Based on 2021 AUFM Estimate $150,000
Updated Estimate from Raymond. 2nd flr repair $500,000
4/27/23 - $17K FY23 for Design |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal |
|
| 49 |
| rnr_id |
701 |
| fiscal_year |
FY23 |
| proj_num |
21-514 |
| bldg_name |
Parkerson Mill Creek |
| proj_desc |
Parkerson Mill Greenway Phase III |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
449050.00 |
| total_funding |
NULL |
| proj_system |
PEDESTRIAN PAVING |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
103.00 |
| rank_by_direct |
8.00 |
| system_rank |
NULL |
| system_fci |
2 |
| est_useful_life |
0-2 |
| priority |
2 |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 16:02:19.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
Moved to FY23. Funding was provided in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Campus Upgrade |
|
| 50 |
| rnr_id |
702 |
| fiscal_year |
FY24 |
| proj_num |
22-475 |
| bldg_name |
Extension Hall |
| proj_desc |
Dedicated Outdoor Air System (Design Only) |
| design_constr |
DESIGN |
| prev_funded |
NULL |
| future_fund |
80000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-15 15:59:00.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
[8/27/19] added to the list. Updated budget 05-17-2022 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 51 |
| rnr_id |
703 |
| fiscal_year |
FY23 |
| proj_num |
22-415 |
| bldg_name |
Heisman Drive and Wire Road |
| proj_desc |
Replace Traffic Control System |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
TRAFFIC SIGNALS |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
115.20 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-05-15 15:57:33.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
[7/18/19] added to list per Ken M |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 52 |
| rnr_id |
704 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Magnolia Av & Wire Road |
| proj_desc |
[UE97] Replace Storm Sewer Line (18 or 20 inch) for approximately 350 feet from West Magnolia Av to south side of Sigma Nu parking lot |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
132000.00 |
| total_funding |
NULL |
| proj_system |
STORM SEWER SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
85.00 |
| rank_by_direct |
13.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
Rob Engle |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:28:58.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 53 |
| rnr_id |
705 |
| fiscal_year |
FY23 |
| proj_num |
22-038 |
| bldg_name |
Corley Building |
| proj_desc |
Roof Replacement (ref 20-441 for study) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
600000.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
121.00 |
| rank_by_direct |
NULL |
| system_rank |
15.00 |
| system_fci |
2 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
Bob Hix |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-02-27 14:03:30.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
Roof Survey - High Priority - Project Cost is Construction Only |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 54 |
| rnr_id |
706 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Martin Hall |
| proj_desc |
Suite 108, Window Replacements & Repairs (ref18-260, 17-071 & 10-209 for prior comprehensive efforts) - CONSTRUCTION PORTION ONLY |
| design_constr |
CONSTR |
| prev_funded |
NULL |
| future_fund |
300000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
71.00 |
| rank_by_direct |
NULL |
| system_rank |
10.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:16:43.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
(06/22/2017) Joe Hunter/Travis Trally submitted this PIF request. (09/17/2018) per Mark A, FY19 reserve set at $281,000.
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 55 |
| rnr_id |
707 |
| fiscal_year |
FY23 |
| proj_num |
22-416 |
| bldg_name |
Corley Building |
| proj_desc |
Concrete Paving replacement (Ref 21-279) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
92208.00 |
| total_funding |
NULL |
| proj_system |
ROADWAY |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
90.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:40:49.000 |
| edited_by |
hixjame |
| funding_status |
5 - FUTURE |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Safety |
|
| 56 |
| rnr_id |
708 |
| fiscal_year |
FY23 |
| proj_num |
21-165 |
| bldg_name |
Ramsay Hall |
| proj_desc |
Replace Brick Sidewalk With Concrete & Entry Step Improvements |
| design_constr |
CONSTR |
| prev_funded |
NULL |
| future_fund |
251875.00 |
| total_funding |
NULL |
| proj_system |
SITE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
98.00 |
| rank_by_direct |
1.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2022-08-16 09:22:50.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 15:59:10.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 57 |
| rnr_id |
709 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Greene Hall |
| proj_desc |
Roof Replacement (excluding Dean\\\'s Office Area, ref 16-080; and 16-183 for prior design efforts) - CONSTRUCTION PORTION ONLY. Can be divided. |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
2538393.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
3.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
Brad Johnson |
| date_created |
2022-08-16 09:59:17.000 |
| created_by |
hixjame |
| date_edited |
2022-08-16 10:02:33.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 58 |
| rnr_id |
710 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Haley |
| proj_desc |
Motor Control Centers (MCC) Replacement in 10th Floor |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
65000.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
3.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Brad Johnson |
| date_created |
2022-08-16 10:03:36.000 |
| created_by |
hixjame |
| date_edited |
2022-08-16 10:06:06.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 59 |
| rnr_id |
711 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Nichols |
| proj_desc |
Replace AHU # 1 |
| design_constr |
DESIGN |
| prev_funded |
NULL |
| future_fund |
300000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
3.00 |
| system_fci |
2 |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
Brad Johnson |
| date_created |
2022-08-16 10:06:31.000 |
| created_by |
hixjame |
| date_edited |
2022-08-16 10:08:27.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 60 |
| rnr_id |
712 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Martin Aquatics |
| proj_desc |
Roof Replacement or Repairs for INSTRUCTIONAL POOL area (ref 15-144 for study & 15-313, 16-058) - CONSTRUCTION PORTION ONLY |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
997500.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
16.00 |
| system_rank |
4.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Brad Johnson |
| date_created |
2022-08-16 10:09:11.000 |
| created_by |
hixjame |
| date_edited |
2022-08-16 10:11:47.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 61 |
| rnr_id |
713 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Harbert |
| proj_desc |
Elevator - replace controls and fixtures |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
150000.00 |
| total_funding |
NULL |
| proj_system |
CONVEYANCE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
17.00 |
| system_rank |
2.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Brad Johnson |
| date_created |
2022-08-16 10:12:31.000 |
| created_by |
hixjame |
| date_edited |
2022-08-16 10:13:48.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 62 |
| rnr_id |
714 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Langdon Annex |
| proj_desc |
Comprehensive Building Envelope Restoration Phase 1 - First Floor Water Intrusion (ref 18-024 & 18-025 for prior STUDIES) - CONSTRUCTION PORTION ONLY |
| design_constr |
CONSTR |
| prev_funded |
NULL |
| future_fund |
510420.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
18.00 |
| system_rank |
4.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Brad Johnson |
| date_created |
2022-08-16 10:14:06.000 |
| created_by |
hixjame |
| date_edited |
2022-08-16 10:17:49.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 63 |
| rnr_id |
715 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Extension Hall |
| proj_desc |
Dedicated Outdoor Air System (Construction Only) |
| design_constr |
CONSTR |
| prev_funded |
NULL |
| future_fund |
450000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2022-08-16 11:14:01.000 |
| created_by |
yonbenj |
| date_edited |
2022-08-16 11:15:48.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 64 |
| rnr_id |
717 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Draughon Library |
| proj_desc |
Roof Replacement & Building Envelope Sealant Repairs - CONSTRUCTION PORTION ONLY. Phase III |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
1000000.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
10.00 |
| system_rank |
1.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Brad Johnson |
| date_created |
2022-08-16 11:35:57.000 |
| created_by |
yonbenj |
| date_edited |
2022-08-16 11:37:35.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 65 |
| rnr_id |
718 |
| fiscal_year |
FY23 |
| proj_num |
N/A |
| bldg_name |
Campus Wide |
| proj_desc |
Emergency Reserve |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
525130.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
1.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Nolan Yon |
| date_created |
2022-08-16 11:56:07.000 |
| created_by |
hixjame |
| date_edited |
2023-06-26 09:04:12.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 66 |
| rnr_id |
719 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Comer Hall |
| proj_desc |
Connect Comer Hall to central hot water system and put boiler in Funchess to remove the steam to each building from Satellite |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
1600000.00 |
| total_funding |
NULL |
| proj_system |
HOT WATER DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
8.00 |
| system_rank |
NULL |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Ken Martin |
| date_created |
2022-08-16 13:30:55.000 |
| created_by |
hixjame |
| date_edited |
2023-06-29 08:02:53.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 67 |
| rnr_id |
720 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Campus Wide |
| proj_desc |
Replacement of 3 live front switches on Circuit 14 with underground Vista switches. Switch #s: 171 (14), Ross Square, 072(14) Mell Street across from Mell Classroom, 168 (14) Ross Hall |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
300000.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
80.00 |
| rank_by_direct |
10.00 |
| system_rank |
2.00 |
| system_fci |
2 |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
Ken Martin |
| date_created |
2022-08-16 13:34:23.000 |
| created_by |
hixjame |
| date_edited |
2023-03-03 15:26:09.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Moved from FY23 plan to FY24 on 3/3/23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 68 |
| rnr_id |
722 |
| fiscal_year |
FY23 |
| proj_num |
21-231 |
| bldg_name |
Draughon Library Parking Deck |
| proj_desc |
Replace portion of the sanitary sewer line that runs south of the Library Deck and goes towards Mell St. There is a portion of the line that is flat. |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
474082.00 |
| total_funding |
NULL |
| proj_system |
SANITARY SEWER SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
108.00 |
| rank_by_direct |
9.00 |
| system_rank |
2.00 |
| system_fci |
1 |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2022-08-16 13:38:05.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 14:20:23.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal |
|
| 69 |
| rnr_id |
723 |
| fiscal_year |
FY23 |
| proj_num |
22-381 |
| bldg_name |
Harris Early Learning Center |
| proj_desc |
AVP RESERVATION: Replace Shingle Roof, price based on 2019 Stephen Ward and Associates estimate |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
650000.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
AVP Facilities Mgmt |
| fm_overall_rank |
105.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Nolan Yon |
| date_created |
2022-09-01 16:05:35.000 |
| created_by |
yonbenj |
| date_edited |
2023-01-11 15:00:06.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project approved by Kelli Shomaker, budget updated by Conradson to $650k
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 70 |
| rnr_id |
724 |
| fiscal_year |
FY23 |
| proj_num |
21-364 |
| bldg_name |
Biggin Hall |
| proj_desc |
Elevator Modernization & Upgrades |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
688500.00 |
| total_funding |
NULL |
| proj_system |
CONVEYANCE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
100.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Brad Johnson |
| date_created |
2022-10-11 08:06:31.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 16:00:25.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 71 |
| rnr_id |
725 |
| fiscal_year |
FY23 |
| proj_num |
22-422 |
| bldg_name |
cw |
| proj_desc |
ANNUAL RESERVE - Various Small LANDSCAPE, Tree Preservation, and Irrigation Improvement Efforts - FY23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
200000.00 |
| total_funding |
NULL |
| proj_system |
LANDSCAPING |
| fac_dept |
FO - Landscape Services |
| fm_overall_rank |
20.00 |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Justin Sutton |
| date_created |
2022-10-11 14:08:37.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 15:14:43.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Campus Upgrade |
|
| 72 |
| rnr_id |
726 |
| fiscal_year |
FY23 |
| proj_num |
22-395 |
| bldg_name |
Woodfield Drive |
| proj_desc |
New Sidewalk along Woodfield Drive from GPAC to College St. |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
500000.00 |
| total_funding |
NULL |
| proj_system |
PEDESTRIAN PAVING |
| fac_dept |
AVP Facilities Mgmt |
| fm_overall_rank |
96.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
Nolan Yon |
| date_created |
2022-10-13 08:05:55.000 |
| created_by |
yonbenj |
| date_edited |
2023-01-11 14:59:56.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 73 |
| rnr_id |
727 |
| fiscal_year |
FY23 |
| proj_num |
21-085 |
| bldg_name |
Student Activities Center |
| proj_desc |
HVAC System & Air Quality Improvements (Phase I) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
1649700.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
101.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Eric Moore |
| date_created |
2022-10-13 11:11:14.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-28 14:43:11.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 74 |
| rnr_id |
728 |
| fiscal_year |
FY23 |
| proj_num |
21-491 |
| bldg_name |
Ag Hill |
| proj_desc |
Steam Vault & Distribution Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
209942.28 |
| total_funding |
NULL |
| proj_system |
STEAM DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
97.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Nolan Yon |
| date_created |
2022-10-13 11:23:19.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 15:58:48.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 75 |
| rnr_id |
729 |
| fiscal_year |
FY23 |
| proj_num |
22-330 |
| bldg_name |
Heisman Drive |
| proj_desc |
Heisman Drive - Asphalt Repairs Between Jordan-Hare Stadium & Petrie Hall |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
88996.00 |
| total_funding |
NULL |
| proj_system |
ROADWAY |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
88.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Ben Burmester |
| date_created |
2022-10-13 15:06:30.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 15:34:22.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Orig Est $100K. Chng to $121,750 on 11/29 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 76 |
| rnr_id |
730 |
| fiscal_year |
FY23 |
| proj_num |
future |
| bldg_name |
Martin Aquatics Center |
| proj_desc |
Repairs in preparation for February 2024 SEC tournament hosting, Pool filters 50% split $487,500 & elevator modernization 80/20 split $252,000 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
500000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
102.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Bob Hix |
| date_created |
2022-10-14 08:11:34.000 |
| created_by |
yonbenj |
| date_edited |
2023-05-10 16:12:54.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 77 |
| rnr_id |
731 |
| fiscal_year |
FY24 |
| proj_num |
20-478 |
| bldg_name |
Davis Hall |
| proj_desc |
Building Envelope Restoration Phase II (Ref 20-478) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
900000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Ben Burmester |
| date_created |
2022-10-20 10:31:10.000 |
| created_by |
yonbenj |
| date_edited |
2022-10-27 12:50:02.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 78 |
| rnr_id |
732 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Draughon Library Parking Deck |
| proj_desc |
Repairs found in Structural condition assessment 21-317 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
STRUCTURE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Ben Burmester |
| date_created |
2022-10-20 10:33:59.000 |
| created_by |
yonbenj |
| date_edited |
2022-10-20 10:47:43.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 79 |
| rnr_id |
733 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
South College St Parking Deck |
| proj_desc |
Structural Repairs as a result of structural condition assessment (21-318) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
STRUCTURE |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Ben Burmester |
| date_created |
2022-10-20 10:44:53.000 |
| created_by |
yonbenj |
| date_edited |
2022-10-20 10:47:41.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 80 |
| rnr_id |
734 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
OIT Building |
| proj_desc |
Resolve Water Instrusion issues found in Proj 21-509 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
250000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Ben Burmester |
| date_created |
2022-10-20 10:47:56.000 |
| created_by |
yonbenj |
| date_edited |
2022-10-20 10:52:36.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 81 |
| rnr_id |
735 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Campus Services: Cleaning Of Classroom Floors And Furnishings, Grout Restorations |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Campus Services |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Dee Sneed |
| date_created |
2022-10-21 12:31:56.000 |
| created_by |
yonbenj |
| date_edited |
2023-05-16 08:47:41.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
AR |
|
| 82 |
| rnr_id |
737 |
| fiscal_year |
FY24 |
| proj_num |
21-400 |
| bldg_name |
Quad Residence Halls |
| proj_desc |
Contribution to Renovation Project for outside ADA work - Phase 3 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
150000.00 |
| total_funding |
NULL |
| proj_system |
SITE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Nolan Yon |
| date_created |
2022-10-21 12:39:39.000 |
| created_by |
yonbenj |
| date_edited |
2022-11-01 16:25:41.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 83 |
| rnr_id |
738 |
| fiscal_year |
TBD |
| proj_num |
NULL |
| bldg_name |
Dawson Building |
| proj_desc |
Replace sanitary sewer (specifically and most needed is section between unisex bathroom and men\\\'s/women\\\'s restroom) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
PLUMBING |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Brad Johnson |
| date_created |
2022-10-21 12:43:56.000 |
| created_by |
yonbenj |
| date_edited |
2022-10-21 13:07:41.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 84 |
| rnr_id |
739 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
USDA Wire Road |
| proj_desc |
[UE198] Replace natural gas steel line that serves the building |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
30000.00 |
| total_funding |
NULL |
| proj_system |
NATURAL GAS DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
4.00 |
| system_rank |
1.00 |
| system_fci |
1 |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Rob Engle |
| date_created |
2022-10-21 12:55:30.000 |
| created_by |
yonbenj |
| date_edited |
2022-11-15 10:38:33.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 85 |
| rnr_id |
740 |
| fiscal_year |
FY24 |
| proj_num |
18-540 |
| bldg_name |
Campus Wide |
| proj_desc |
Install auto transfer capability for critical loads- Arena first |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
250000.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Rob Engle |
| date_created |
2022-10-21 13:05:24.000 |
| created_by |
yonbenj |
| date_edited |
2022-11-15 10:38:16.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 86 |
| rnr_id |
741 |
| fiscal_year |
FY25 |
| proj_num |
future |
| bldg_name |
Nichols Center to Heisman Dr |
| proj_desc |
[UE16] Repair storm sewer from Nichols Center up to Heisman Drive 60 or 72 inch |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
350964.00 |
| total_funding |
NULL |
| proj_system |
STORM SEWER SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Rob Engle |
| date_created |
2022-10-21 13:16:53.000 |
| created_by |
yonbenj |
| date_edited |
2022-11-15 10:38:30.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 87 |
| rnr_id |
742 |
| fiscal_year |
FY24 |
| proj_num |
future |
| bldg_name |
Chilled Water Plant II |
| proj_desc |
Connect the condensate return from ACLC and Dining to Chilled water plant II tower basin |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
SANITARY SEWER SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Rob Engle |
| date_created |
2022-10-21 13:43:12.000 |
| created_by |
yonbenj |
| date_edited |
2022-11-15 10:38:23.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 88 |
| rnr_id |
743 |
| fiscal_year |
FY25 |
| proj_num |
future |
| bldg_name |
Campus Wide - Utilities & Energy Mgmt |
| proj_desc |
[UE188] Connect building makeup meters to Sensus system |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
70000.00 |
| total_funding |
NULL |
| proj_system |
DOMESTIC WATER DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Rob Engle |
| date_created |
2022-10-21 13:48:08.000 |
| created_by |
yonbenj |
| date_edited |
2022-11-15 10:38:20.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 89 |
| rnr_id |
744 |
| fiscal_year |
FY23 |
| proj_num |
21-486 |
| bldg_name |
Not Listed |
| proj_desc |
Donahue Drive & Auburn Research Park - Domestic Water System Improvements |
| design_constr |
CONSTR |
| prev_funded |
88600.00 |
| future_fund |
88600.00 |
| total_funding |
214940.00 |
| proj_system |
DOMESTIC WATER DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
107.00 |
| rank_by_direct |
NULL |
| system_rank |
1.00 |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2022-12-02 08:20:10.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 16:04:26.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Original budget of $126,340.00 approved in FY22, budget revision of $88,600.00 approved in FY23, Project total $214,940.00. This project will allow the MRI building to be isolated from the remainder of the research park resulting in minimal disruptions d |
| archive |
0 |
| exe_constraint |
None None |
| classification |
NULL |
|
| 90 |
| rnr_id |
745 |
| fiscal_year |
FY23 |
| proj_num |
22-356 |
| bldg_name |
Cary Hall |
| proj_desc |
Entry ADA Improvemnts |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
235200.00 |
| total_funding |
NULL |
| proj_system |
SITE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
109.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-01-17 08:32:31.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 16:05:05.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Used Annual Reserve for ADA Accessibility Improvements to help fund this project. $100K
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Campus Upgrade Campus Upgrade |
|
| 91 |
| rnr_id |
746 |
| fiscal_year |
FY24 |
| proj_num |
Future |
| bldg_name |
Not Listed |
| proj_desc |
Replace 5 fiberglass light poles located on Lem Morrison between Duncan and PO Davis |
| design_constr |
DESIGN |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
EXTERIOR SITE LIGHTING >12\' |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
3 |
| proj_champ |
Ken Martin |
| date_created |
2023-01-30 14:17:02.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:09:43.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Keith Nall mentioned that poles are not University Standard. Light from existing poles are affecting Old Rotation Research |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 92 |
| rnr_id |
747 |
| fiscal_year |
FY24 |
| proj_num |
Future |
| bldg_name |
Foy Hall |
| proj_desc |
Renovate 1st Floor Restrooms, Rm 158, 160, & 162 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
900000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-01-30 15:23:48.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:40:44.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Ref. 18-096. Project was estimated at $500K in 2018 |
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
Asset Renewal Asset Renewal |
|
| 93 |
| rnr_id |
748 |
| fiscal_year |
NULL |
| proj_num |
21-529 |
| bldg_name |
Facilities Management 1 |
| proj_desc |
Facilities Building 1 - Flooring Replacement and Workstation Study |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
350000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Simon Yendle |
| date_created |
2023-01-31 07:45:14.000 |
| created_by |
hixjame |
| date_edited |
2023-01-31 07:49:54.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project not on FY23 plan |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 94 |
| rnr_id |
749 |
| fiscal_year |
FY23 |
| proj_num |
22-429 |
| bldg_name |
Paterson Greenhouse 8 |
| proj_desc |
Patterson Greenhouse Repair and Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
85000.00 |
| total_funding |
NULL |
| proj_system |
STRUCTURE |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
48.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 15:12:52.000 |
| created_by |
hixjame |
| date_edited |
2023-05-03 15:44:10.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $75K match to client |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 95 |
| rnr_id |
750 |
| fiscal_year |
FY23 |
| proj_num |
22-428 |
| bldg_name |
Not Listed |
| proj_desc |
Shell Fisheries Research Station Laboratory water treatment improvement system |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
47.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 15:20:19.000 |
| created_by |
hixjame |
| date_edited |
2023-04-25 16:02:25.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project $75K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 96 |
| rnr_id |
751 |
| fiscal_year |
FY23 |
| proj_num |
22-295 |
| bldg_name |
Dudley Hall |
| proj_desc |
Dudley Hall Courtyard Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
62500.00 |
| total_funding |
NULL |
| proj_system |
PEDESTRIAN PAVING |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
36.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 15:25:15.000 |
| created_by |
hixjame |
| date_edited |
2023-04-25 16:02:39.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $62.5K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 97 |
| rnr_id |
752 |
| fiscal_year |
FY23 |
| proj_num |
22-082 |
| bldg_name |
Lowder Hall |
| proj_desc |
Lowder Hall Rm 024 convrersion from Computer Lab to a Business Analytics Lab |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
35.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
2023-02-01 15:26:56.000 |
| created_by |
hixjame |
| date_edited |
2023-06-26 09:05:31.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $75K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 98 |
| rnr_id |
753 |
| fiscal_year |
FY23 |
| proj_num |
22-432 |
| bldg_name |
Ross Hall |
| proj_desc |
Ross Hall Rm 309 Convert Research Lab to Teaching Lab |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
46.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 15:37:23.000 |
| created_by |
hixjame |
| date_edited |
2023-04-25 16:03:08.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $28K with client match
2/24/23 - project was estimated incorrectly. $75K
|
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
PPP |
|
| 99 |
| rnr_id |
754 |
| fiscal_year |
FY23 |
| proj_num |
22-311 |
| bldg_name |
Davis Hall |
| proj_desc |
Drone Flight Arena |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
39.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 15:58:55.000 |
| created_by |
hixjame |
| date_edited |
2023-04-25 16:03:17.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $75K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 100 |
| rnr_id |
755 |
| fiscal_year |
FY23 |
| proj_num |
22-437 |
| bldg_name |
Spidle Hall |
| proj_desc |
Spidle Rm 238 Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
45.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 16:00:45.000 |
| created_by |
hixjame |
| date_edited |
2023-04-25 16:03:34.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $75K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 101 |
| rnr_id |
756 |
| fiscal_year |
FY23 |
| proj_num |
22-431 |
| bldg_name |
Haley Center |
| proj_desc |
Haley Rm 372 Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
44.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 16:02:59.000 |
| created_by |
hixjame |
| date_edited |
2023-04-25 16:05:54.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $58K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 102 |
| rnr_id |
757 |
| fiscal_year |
FY23 |
| proj_num |
22-430 |
| bldg_name |
Walker Building |
| proj_desc |
Walker Rm C2303 & C2201 Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
43.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 16:07:33.000 |
| created_by |
hixjame |
| date_edited |
2023-04-25 16:04:54.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $75K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 103 |
| rnr_id |
758 |
| fiscal_year |
FY23 |
| proj_num |
22-448 |
| bldg_name |
Chemistry Building |
| proj_desc |
Chemistry Atrium Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
42.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 16:09:14.000 |
| created_by |
hixjame |
| date_edited |
2023-05-17 10:05:11.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
PPP Project - $64.2K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 104 |
| rnr_id |
759 |
| fiscal_year |
FY23 |
| proj_num |
22-447 |
| bldg_name |
Chemistry Building |
| proj_desc |
Chemistry Rm 156 Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
41.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 16:10:30.000 |
| created_by |
hixjame |
| date_edited |
2023-04-25 16:05:17.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $75K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 105 |
| rnr_id |
760 |
| fiscal_year |
FY23 |
| proj_num |
22-438 |
| bldg_name |
Spidle Hall |
| proj_desc |
Spidle Rm 372 Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
58000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
40.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-01 16:19:26.000 |
| created_by |
hixjame |
| date_edited |
2023-04-25 16:03:45.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Project - $58K with client match |
| archive |
0 |
| exe_constraint |
None |
| classification |
PPP |
|
| 106 |
| rnr_id |
761 |
| fiscal_year |
FY23 |
| proj_num |
23-005 |
| bldg_name |
Walker Building |
| proj_desc |
Walker Freeze Damage Repairs |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
5000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
7.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-03 09:19:50.000 |
| created_by |
hixjame |
| date_edited |
2023-05-26 11:13:53.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Emergency Reserve Funding. $5K deductable |
| archive |
0 |
| exe_constraint |
None |
| classification |
ER |
|
| 107 |
| rnr_id |
762 |
| fiscal_year |
FY23 |
| proj_num |
23-006 |
| bldg_name |
Davis Hall |
| proj_desc |
Davis Freeze Damage Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
5000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
6.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-03 09:23:24.000 |
| created_by |
hixjame |
| date_edited |
2023-05-26 11:13:40.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Emergency Reserve Funding. $5K deductable |
| archive |
0 |
| exe_constraint |
None |
| classification |
ER |
|
| 108 |
| rnr_id |
763 |
| fiscal_year |
FY23 |
| proj_num |
23-012 |
| bldg_name |
Not Listed |
| proj_desc |
Airport Hanger Freeze Damage Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
15170.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
3.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-03 09:24:39.000 |
| created_by |
hixjame |
| date_edited |
2023-06-12 09:49:27.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Emergency Reserve Funding. $5K deductable |
| archive |
0 |
| exe_constraint |
None |
| classification |
ER |
|
| 109 |
| rnr_id |
764 |
| fiscal_year |
FY23 |
| proj_num |
23-014 |
| bldg_name |
Beard-Eaves-Memorial Coliseum |
| proj_desc |
Beard Eaves Freeze Damage Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
5000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
2.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-03 09:28:36.000 |
| created_by |
hixjame |
| date_edited |
2023-05-26 11:13:36.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Emergency Reserve Funding. $5K deductable |
| archive |
0 |
| exe_constraint |
None |
| classification |
ER |
|
| 110 |
| rnr_id |
765 |
| fiscal_year |
FY23 |
| proj_num |
23-015 |
| bldg_name |
Facilities Management 7 |
| proj_desc |
Facilitiea Bldg 7 Freeze Damage Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
5000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
4.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-03 09:30:37.000 |
| created_by |
hixjame |
| date_edited |
2023-05-26 11:13:43.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Emergency Reserve Funding. $5K deductable |
| archive |
0 |
| exe_constraint |
None |
| classification |
ER |
|
| 111 |
| rnr_id |
766 |
| fiscal_year |
FY23 |
| proj_num |
23-016 |
| bldg_name |
Hotel/Dixon Conference Center |
| proj_desc |
Hotel Freeze Damage Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
5000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
8.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-03 09:31:50.000 |
| created_by |
hixjame |
| date_edited |
2023-05-26 11:13:14.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Emergency Reserve Funding. $5K deductable |
| archive |
0 |
| exe_constraint |
None |
| classification |
ER |
|
| 112 |
| rnr_id |
767 |
| fiscal_year |
FY23 |
| proj_num |
23-017 |
| bldg_name |
Not Listed |
| proj_desc |
Halliday Cary Pick Freeze Damage Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
5000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
5.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-03 09:33:18.000 |
| created_by |
hixjame |
| date_edited |
2023-05-26 11:13:47.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Emergency Reserve Funding. $5K deductable |
| archive |
0 |
| exe_constraint |
None |
| classification |
ER |
|
| 113 |
| rnr_id |
768 |
| fiscal_year |
FY23 |
| proj_num |
23-293 |
| bldg_name |
Campus Wide |
| proj_desc |
Spare 2000 kVA transformer for Campus |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
126355.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
12.50 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-08 08:20:32.000 |
| created_by |
hixjame |
| date_edited |
2023-06-14 08:41:36.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Currently do not have a spare on Campus
Will use AR funds for Commissioning 19-044 ($75K) as partial |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 114 |
| rnr_id |
769 |
| fiscal_year |
FY23 |
| proj_num |
23-054 |
| bldg_name |
Davis Hall |
| proj_desc |
Davis Hall Exterior Cleaning |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
25000.00 |
| total_funding |
NULL |
| proj_system |
STRUCTURE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
31.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-08 08:42:55.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:09:23.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Funding from 22-341 |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 115 |
| rnr_id |
770 |
| fiscal_year |
FY23 |
| proj_num |
22-072 |
| bldg_name |
Samford Hall |
| proj_desc |
Samford Hall - Room 107, Wall & Chase Repair Due To Water Damage |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
2369.00 |
| total_funding |
NULL |
| proj_system |
SANITARY SEWER SYSTEM |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
87.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-14 07:45:20.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:07:40.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
RR funded $280,345 in FY22 |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 116 |
| rnr_id |
771 |
| fiscal_year |
FY23 |
| proj_num |
20-250 |
| bldg_name |
Not Listed |
| proj_desc |
Intramural Tennis Courts - Windscreen and Bleachers |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
101000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
106.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-16 11:18:04.000 |
| created_by |
hixjame |
| date_edited |
2023-04-26 16:10:54.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project was supposed to be funded by FPB. RR to split cost with Student Services |
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
Campus Upgrade Campus Upgrade |
|
| 117 |
| rnr_id |
772 |
| fiscal_year |
FY23 |
| proj_num |
23-093 |
| bldg_name |
Not Listed |
| proj_desc |
Extension Drive - Evaluate & Repair Erosion & Culvert Seperation At CDV |
| design_constr |
CONSTR |
| prev_funded |
NULL |
| future_fund |
210000.00 |
| total_funding |
NULL |
| proj_system |
STORM SEWER SYSTEM |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
11.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
Ben Burmester |
| date_created |
2023-02-23 09:06:39.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:09:26.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Emergency Repair |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 118 |
| rnr_id |
773 |
| fiscal_year |
FY23 |
| proj_num |
21-557 |
| bldg_name |
Gilmer-Turnham Annex |
| proj_desc |
Gilmer-Turnham Bldg To Beef Cattle Evaluation Center - Sanitary Sewer Improvements |
| design_constr |
CONSTR |
| prev_funded |
NULL |
| future_fund |
445850.00 |
| total_funding |
NULL |
| proj_system |
SANITARY SEWER SYSTEM |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
118.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
Ken Martin |
| date_created |
2023-02-23 09:12:25.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:07:35.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Has FY22 funding. Will need additional FY23 funding to execute construction |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 119 |
| rnr_id |
774 |
| fiscal_year |
FY23 |
| proj_num |
21-336 |
| bldg_name |
Corley Building |
| proj_desc |
Corley Building - Rms 302, 307 & 314, HVAC System Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
176447.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
99.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-02-24 16:08:14.000 |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:59:58.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project was funded $410K in FY21. Additional funding needed of $177K
|
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
Asset Renewal Asset Renewal |
|
| 120 |
| rnr_id |
775 |
| fiscal_year |
FY23 |
| proj_num |
21-239 |
| bldg_name |
Swine Farrowing Barn |
| proj_desc |
Swine Research - New Heating System |
| design_constr |
CONSTR |
| prev_funded |
NULL |
| future_fund |
40017.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
91.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-07 09:58:27.000 |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:47:53.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project funded in FY23 |
| archive |
0 |
| exe_constraint |
None None |
| classification |
Asset Renewal |
|
| 121 |
| rnr_id |
776 |
| fiscal_year |
FY23 |
| proj_num |
22-242 |
| bldg_name |
Samford Hall |
| proj_desc |
Samford Hall - Suite 29, Replace Carpet |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
20198.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
57.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-07 10:03:01.000 |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:38:22.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project funded in FY23 |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 122 |
| rnr_id |
777 |
| fiscal_year |
FY23 |
| proj_num |
22-112 |
| bldg_name |
Chemistry Building |
| proj_desc |
Chemistry Building - Southside Investigate Water Intrusion |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
500.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
51.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-07 10:06:16.000 |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:32:43.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project funded in FY23 |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 123 |
| rnr_id |
778 |
| fiscal_year |
FY23 |
| proj_num |
22-187 |
| bldg_name |
Not Listed |
| proj_desc |
Samford Park - Sidewalk Replacement |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
36614.00 |
| total_funding |
NULL |
| proj_system |
PEDESTRIAN PAVING |
| fac_dept |
FO - Landscape Services |
| fm_overall_rank |
54.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-07 10:08:40.000 |
| created_by |
hixjame |
| date_edited |
2023-04-27 15:35:09.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project funded in FY23 |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 124 |
| rnr_id |
779 |
| fiscal_year |
FY22 |
| proj_num |
21-548 |
| bldg_name |
President's House |
| proj_desc |
Install covers on all chimneys |
| design_constr |
CONSTR |
| prev_funded |
NULL |
| future_fund |
51200.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 09:32:23.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 09:50:37.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal |
|
| 125 |
| rnr_id |
780 |
| fiscal_year |
FY23 |
| proj_num |
22-412 |
| bldg_name |
Walker Building |
| proj_desc |
Replace Heat Exchanger |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
15000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
66.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 09:55:21.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 09:58:03.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
$20k from major alt, $15k from R&R FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 126 |
| rnr_id |
781 |
| fiscal_year |
FY23 |
| proj_num |
20-143 |
| bldg_name |
Campus Wide |
| proj_desc |
Land Survey for all AU properties |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
900.00 |
| total_funding |
NULL |
| proj_system |
SITE |
| fac_dept |
PD+C - Campus Planning |
| fm_overall_rank |
81.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 09:59:57.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-18 11:07:23.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
NULL |
|
| 127 |
| rnr_id |
782 |
| fiscal_year |
FY23 |
| proj_num |
21-535 |
| bldg_name |
Walker Building |
| proj_desc |
Room 1114, Renovate and Convert into HSOP Collaborative Space |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50175.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
37.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
Nolan Yon |
| date_created |
2023-03-08 10:02:49.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 10:06:31.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
FY23 PPP project |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Campus Upgrade Campus Upgrade |
|
| 128 |
| rnr_id |
783 |
| fiscal_year |
FY23 |
| proj_num |
22-436 |
| bldg_name |
Campus Wide |
| proj_desc |
842 S. College St. - Repair Capped Sanitary Sewer Service Line |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
3024.00 |
| total_funding |
NULL |
| proj_system |
SANITARY SEWER SYSTEM |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
52.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 10:08:56.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 15:33:17.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 129 |
| rnr_id |
784 |
| fiscal_year |
FY23 |
| proj_num |
22-387 |
| bldg_name |
Comer Hall |
| proj_desc |
Rms 209A & 307B, Replace Asbestos Flooring |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
6535.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
58.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 10:21:26.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 10:23:45.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
Project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 130 |
| rnr_id |
785 |
| fiscal_year |
FY23 |
| proj_num |
22-382 |
| bldg_name |
Not Listed |
| proj_desc |
Harris Early Learning Center - South Wall, remove and replace EIFS |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
28398.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
AVP Facilities Mgmt |
| fm_overall_rank |
53.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 10:26:22.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 15:33:51.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 131 |
| rnr_id |
786 |
| fiscal_year |
FY23 |
| proj_num |
22-159 |
| bldg_name |
Melton Student Center |
| proj_desc |
Tiger Transit Canopy Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
25325.00 |
| total_funding |
NULL |
| proj_system |
STRUCTURE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
80.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
2023-03-08 10:32:18.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 10:36:40.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 132 |
| rnr_id |
787 |
| fiscal_year |
FY23 |
| proj_num |
21-560 |
| bldg_name |
Haley Center |
| proj_desc |
Basement Mechanical Room, Motor Control Center Replacements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
165500.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
93.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 10:48:43.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 10:50:41.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 133 |
| rnr_id |
788 |
| fiscal_year |
FY23 |
| proj_num |
21-556 |
| bldg_name |
Peet Theatre |
| proj_desc |
Primary Transformer & Electrical Service Upgrades |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
507300.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
94.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 10:51:57.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 10:54:19.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 134 |
| rnr_id |
789 |
| fiscal_year |
FY23 |
| proj_num |
20-384 |
| bldg_name |
Campus Wide |
| proj_desc |
Heisman Drive - Tree & Landscape Improvements For Campus Green Transit Hub Area |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
129600.00 |
| total_funding |
NULL |
| proj_system |
SITE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
92.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 10:56:16.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 10:58:15.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Campus Upgrade Campus Upgrade |
|
| 135 |
| rnr_id |
791 |
| fiscal_year |
FY23 |
| proj_num |
21-327 |
| bldg_name |
Dudley Hall |
| proj_desc |
1st Floor, New Instructional APLA Jury & Exhibition Space |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
65349.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
38.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 11:00:48.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 11:02:01.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
FY23 PPP |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Campus Upgrade Campus Upgrade |
|
| 136 |
| rnr_id |
792 |
| fiscal_year |
FY23 |
| proj_num |
21-507 |
| bldg_name |
Draughon Library and Mell Classroom Building |
| proj_desc |
Rm 2056, Renovate & Convert Into EASL Space |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
3000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
59.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 11:04:42.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 11:07:39.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 137 |
| rnr_id |
793 |
| fiscal_year |
FY23 |
| proj_num |
21-177 |
| bldg_name |
Samford Hall |
| proj_desc |
Lobby, Renovations (Phase I) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
10332.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - In-House Construction |
| fm_overall_rank |
82.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 11:16:22.000 |
| created_by |
yonbenj |
| date_edited |
2023-06-27 11:24:48.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
project funded FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 138 |
| rnr_id |
794 |
| fiscal_year |
FY23 |
| proj_num |
22-339 |
| bldg_name |
Campus Wide |
| proj_desc |
Aerial Imagery Updates For All AU Property In Lee County For 2022-23 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
15000.00 |
| total_funding |
NULL |
| proj_system |
[empty string] |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
24.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 11:19:27.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 11:20:59.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 139 |
| rnr_id |
795 |
| fiscal_year |
FY23 |
| proj_num |
21-265 |
| bldg_name |
Scott-Ritchey Research Center |
| proj_desc |
Rm 233, Cage & Rack Washer Replacement |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
5921.00 |
| total_funding |
NULL |
| proj_system |
PLUMBING |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
89.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 11:22:20.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-28 08:26:19.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Campus Upgrade Campus Upgrade |
|
| 140 |
| rnr_id |
796 |
| fiscal_year |
FY23 |
| proj_num |
22-383 |
| bldg_name |
Spidle Hall |
| proj_desc |
Rm 132, Repair Floor |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
46832.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - In-House Construction |
| fm_overall_rank |
84.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 11:25:08.000 |
| created_by |
yonbenj |
| date_edited |
2023-05-08 16:13:56.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 141 |
| rnr_id |
797 |
| fiscal_year |
FY23 |
| proj_num |
22-133 |
| bldg_name |
Samford Hall |
| proj_desc |
Replace HVAC Fan Coil Units |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
18000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
55.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 14:16:38.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 14:18:22.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 142 |
| rnr_id |
798 |
| fiscal_year |
FY23 |
| proj_num |
22-520 |
| bldg_name |
Environ. Health & Safety Bld 1 |
| proj_desc |
Repair Roof |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
14500.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
56.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 14:22:39.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 14:24:15.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 143 |
| rnr_id |
799 |
| fiscal_year |
FY23 |
| proj_num |
22-537 |
| bldg_name |
Not Listed |
| proj_desc |
Sugg Isolation Bldg 2 - Rm 110, Ceiling Remediation & Repairs |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
7940.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
67.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 14:53:33.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-07 09:08:23.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Funded by Campus Wide Painting Annual Reserve
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 144 |
| rnr_id |
800 |
| fiscal_year |
FY23 |
| proj_num |
22-321 |
| bldg_name |
Langdon Hall |
| proj_desc |
Repair & Paint Front Doors |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
11235.69 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - In-House Construction |
| fm_overall_rank |
61.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 14:57:16.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-13 10:12:22.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 145 |
| rnr_id |
801 |
| fiscal_year |
FY23 |
| proj_num |
22-355 |
| bldg_name |
Greene Hall |
| proj_desc |
Rm 262A, Remove Bench & Other Repairs |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
12000.00 |
| total_funding |
NULL |
| proj_system |
[empty string] |
| fac_dept |
FO - In-House Construction |
| fm_overall_rank |
78.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 15:01:01.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 15:02:23.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 146 |
| rnr_id |
802 |
| fiscal_year |
FY23 |
| proj_num |
22-004 |
| bldg_name |
Walker Building |
| proj_desc |
Suite 4201, Office Renovations & Entryway Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
6850.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
77.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
2023-03-08 15:02:51.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 15:04:01.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 147 |
| rnr_id |
803 |
| fiscal_year |
FY23 |
| proj_num |
22-205 |
| bldg_name |
Leach Science Center |
| proj_desc |
Loading Dock, Man Gate Modification |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
2000.00 |
| total_funding |
NULL |
| proj_system |
SITE |
| fac_dept |
FO - Safety Management |
| fm_overall_rank |
60.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 15:05:42.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 15:07:42.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Safety Safety |
|
| 148 |
| rnr_id |
804 |
| fiscal_year |
FY23 |
| proj_num |
22-274 |
| bldg_name |
Leach Science Center |
| proj_desc |
Butler Building Addition, Steel Column Support |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
9217.00 |
| total_funding |
NULL |
| proj_system |
[empty string] |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
76.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 15:16:01.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 15:22:52.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
project funded in FY23
|
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Safety Safety |
|
| 149 |
| rnr_id |
805 |
| fiscal_year |
FY23 |
| proj_num |
22-511 |
| bldg_name |
Gogue Performing Arts Center |
| proj_desc |
Rear Entrance, Repair Electrical Panel |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
26400.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
79.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 15:28:42.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 15:30:29.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 150 |
| rnr_id |
806 |
| fiscal_year |
FY23 |
| proj_num |
22-269 |
| bldg_name |
Smith Hall, M.W. |
| proj_desc |
Rm 221, New Furnishings |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
7000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
83.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 15:31:54.000 |
| created_by |
yonbenj |
| date_edited |
2023-03-08 15:34:08.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 151 |
| rnr_id |
807 |
| fiscal_year |
FY23 |
| proj_num |
23-107 |
| bldg_name |
Not Listed |
| proj_desc |
Miller Poultry Center - Processing Plant, Ductwork Insulation Repairs |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
10.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-08 15:35:37.000 |
| created_by |
yonbenj |
| date_edited |
2023-05-09 15:13:52.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
project funded in FY23 |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 152 |
| rnr_id |
808 |
| fiscal_year |
FY23 |
| proj_num |
23-149 |
| bldg_name |
Haley Center |
| proj_desc |
Haley Center - Paint railings on the north end |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
43960.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
27.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-20 14:04:47.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:09:33.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project 22-389, Various Campus Wide Painting Services will be reduced by $43,960 |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 153 |
| rnr_id |
809 |
| fiscal_year |
FY23 |
| proj_num |
23-041 |
| bldg_name |
Smith Museum of Art |
| proj_desc |
Replace Boiler |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
150000.00 |
| total_funding |
NULL |
| proj_system |
HOT WATER DISTRIBUTION SYSTEM |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
9.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-22 16:00:12.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:09:20.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Boiler failed during 2022 Christmas Holiday. Repair under Emergency Reserve |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal Asset Renewal |
|
| 154 |
| rnr_id |
810 |
| fiscal_year |
FY23 |
| proj_num |
23-105 |
| bldg_name |
Ramsay Hall |
| proj_desc |
Ramsay Hall - Rms 108D & 108E, Remove Wall - Lead and asbestos testing |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
700.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
64.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-24 09:20:05.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 15:43:57.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Funding approved 03-24-2023 for testing. |
| archive |
0 |
| exe_constraint |
None |
| classification |
Safety Safety |
|
| 155 |
| rnr_id |
811 |
| fiscal_year |
FY23 |
| proj_num |
22-519 |
| bldg_name |
Haley Center |
| proj_desc |
Haley Center - Rms 6075 & 6077, remove wall between rooms |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
8500.00 |
| total_funding |
NULL |
| proj_system |
DEMOLITIONS |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
63.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-24 09:22:52.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 15:43:20.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Funding approved for abatement 03-24-2023 |
| archive |
0 |
| exe_constraint |
None |
| classification |
Campus Upgrade Campus Upgrade |
|
| 156 |
| rnr_id |
812 |
| fiscal_year |
FY23 |
| proj_num |
18-398 |
| bldg_name |
Martin Hall |
| proj_desc |
Mary Martin Hall - Mechanical & Indoor Air Quality Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
10000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
62.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-03-24 10:03:13.000 |
| created_by |
yonbenj |
| date_edited |
2023-04-27 15:42:41.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
FY23 contribution to electrical scope not included in original pricing |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal Asset Renewal |
|
| 157 |
| rnr_id |
813 |
| fiscal_year |
FY23 |
| proj_num |
23-194 |
| bldg_name |
Haley Center |
| proj_desc |
Haley Center - Northside Entrance Cleaning |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
12000.00 |
| total_funding |
NULL |
| proj_system |
EXTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
30.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-07 13:04:51.000 |
| created_by |
hixjame |
| date_edited |
2023-04-07 13:10:09.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Funded from 22-341 Campus Wide Pressure Washing Annual Reserve |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 158 |
| rnr_id |
814 |
| fiscal_year |
FY23 |
| proj_num |
23-190 |
| bldg_name |
Lambert-Powell Meats Laboratory |
| proj_desc |
Wash and Paint Building |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
13200.00 |
| total_funding |
NULL |
| proj_system |
EXTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
28.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-12 08:06:59.000 |
| created_by |
hixjame |
| date_edited |
2023-04-12 08:12:45.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Project will be funded from 23-389 Campus wide Painting Annual Reserve |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 159 |
| rnr_id |
815 |
| fiscal_year |
FY22 |
| proj_num |
18-398 |
| bldg_name |
Mary Martin Hall |
| proj_desc |
HVAC & IAQ Upgrades - DOAS installation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
440266.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
2.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
4/10/2020 updated construction cost to $420k from $250k per email from Carter Miles on 4/10/2020. |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 160 |
| rnr_id |
816 |
| fiscal_year |
FY22 |
| proj_num |
19-044 |
| bldg_name |
Campus Wide - Energy & Utilities |
| proj_desc |
[UE161] Annual Reserve Existing Building Commissioning - FY22 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Utilities and Energy |
| fm_overall_rank |
NULL |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
[6/1/2020] loaded from U&E list |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 161 |
| rnr_id |
817 |
| fiscal_year |
FY22 |
| proj_num |
19-387 |
| bldg_name |
Parkerson Mill Creek |
| proj_desc |
Streambank Erosion Control Phase 3 - at the Forestry & Wildlife Sciences Bldg and Paterson Greenhouses |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
275000.00 |
| total_funding |
NULL |
| proj_system |
LANDSCAPING |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
2.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
(11/01/2017) Added per Mark A. |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 162 |
| rnr_id |
818 |
| fiscal_year |
FY22 |
| proj_num |
20-441 |
| bldg_name |
Corley Building |
| proj_desc |
East Wall, Investigate & Resolve Water Intrusion Issues |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
60540.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 163 |
| rnr_id |
819 |
| fiscal_year |
FY22 |
| proj_num |
21-039 |
| bldg_name |
Swingle Hall |
| proj_desc |
South Entrance, New Ramp & ADA Accessibility Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
294359.00 |
| total_funding |
NULL |
| proj_system |
SITE |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 164 |
| rnr_id |
820 |
| fiscal_year |
FY22 |
| proj_num |
21-059 |
| bldg_name |
CVM Kennel G |
| proj_desc |
Sealer Application For Interior Flooring & Wall Systems |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
54300.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 165 |
| rnr_id |
821 |
| fiscal_year |
FY22 |
| proj_num |
21-161 |
| bldg_name |
Spidle Hall |
| proj_desc |
HVAC & Exhaust Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
208850.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
NULL |
| rank_by_direct |
.20 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
[07/20/2021 UPDATE] "high" priority according to MAINT. Nolan entered "9" to remain in top 10 |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 166 |
| rnr_id |
822 |
| fiscal_year |
FY22 |
| proj_num |
21-228 |
| bldg_name |
AU Hotel & Dixon Conference Center |
| proj_desc |
Boiler Room, Hot Water Storage Tank Repacements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
15000.00 |
| total_funding |
NULL |
| proj_system |
PLUMBING |
| fac_dept |
AVP Facilities Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 167 |
| rnr_id |
823 |
| fiscal_year |
FY22 |
| proj_num |
21-300 |
| bldg_name |
Samford Hall |
| proj_desc |
3rd Floor, Replace AHU on North Side - DESIGN PORTION ONLY |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
683965.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
2.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 168 |
| rnr_id |
824 |
| fiscal_year |
FY22 |
| proj_num |
21-310 |
| bldg_name |
Greene Hall |
| proj_desc |
Rm 130 (Mechanical Room) Structural Repairs |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
124825.00 |
| total_funding |
NULL |
| proj_system |
STRUCTURE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
.01 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 169 |
| rnr_id |
825 |
| fiscal_year |
FY22 |
| proj_num |
21-317 |
| bldg_name |
Draughon Library Parking Deck |
| proj_desc |
Structural Condition Assessment |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
8500.00 |
| total_funding |
NULL |
| proj_system |
STRUCTURE |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 170 |
| rnr_id |
826 |
| fiscal_year |
FY22 |
| proj_num |
21-349 |
| bldg_name |
Martin Aquatics Center |
| proj_desc |
Fire Alarm System Upgrade - Fire Alarm Panel, Devices, and Wiring |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
225000.00 |
| total_funding |
NULL |
| proj_system |
FIRE PROTECTION |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
28.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 171 |
| rnr_id |
827 |
| fiscal_year |
FY22 |
| proj_num |
21-363 |
| bldg_name |
Greene Hall |
| proj_desc |
Suite 125 Roof Replacement |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
350000.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
12.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 172 |
| rnr_id |
828 |
| fiscal_year |
FY22 |
| proj_num |
21-364 |
| bldg_name |
Biggin Hall |
| proj_desc |
Elevator - replace controls, fixtures, door operator |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
150000.00 |
| total_funding |
NULL |
| proj_system |
CONVEYANCE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
4.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 173 |
| rnr_id |
829 |
| fiscal_year |
FY22 |
| proj_num |
21-369 |
| bldg_name |
Wire Road |
| proj_desc |
Bailey Small Animal Treatment Hospital Crosswalk Improvements & Greene Hall Driveway Repaving |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
561300.00 |
| total_funding |
NULL |
| proj_system |
ROADWAY |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 174 |
| rnr_id |
830 |
| fiscal_year |
FY22 |
| proj_num |
21-382 |
| bldg_name |
Plant Science Research Center |
| proj_desc |
Air Handling Unit Replacement |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
78590.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 175 |
| rnr_id |
831 |
| fiscal_year |
FY22 |
| proj_num |
21-407 |
| bldg_name |
Nichols Center |
| proj_desc |
Rooms 115 & 116 Restroom & Shower Renovations |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
262238.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
2.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 176 |
| rnr_id |
832 |
| fiscal_year |
FY22 |
| proj_num |
21-418 |
| bldg_name |
Brown-Kopel Engineering Student Achievement Center |
| proj_desc |
Basement Level, Flooring Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
158119.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 177 |
| rnr_id |
833 |
| fiscal_year |
FY22 |
| proj_num |
21-442 |
| bldg_name |
Crop Improvement Association Building |
| proj_desc |
Roof Replacement (ref. 18-378) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
295900.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
3.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
Covered through Capital Reserves |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 178 |
| rnr_id |
834 |
| fiscal_year |
FY22 |
| proj_num |
21-462 |
| bldg_name |
Hemlock & Duncan Substations |
| proj_desc |
SCADA system upgrades |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
91135.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 179 |
| rnr_id |
835 |
| fiscal_year |
FY22 |
| proj_num |
21-480 |
| bldg_name |
Corley Building |
| proj_desc |
Rms 302, 307, & 314 New HVAC Fan Coil Units |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
409725.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
2.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 180 |
| rnr_id |
836 |
| fiscal_year |
FY22 |
| proj_num |
21-482 |
| bldg_name |
Campus Wide - Maintenance |
| proj_desc |
ANNUAL RESERVE - Various Painting Services - FY22 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
175000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 181 |
| rnr_id |
837 |
| fiscal_year |
FY22 |
| proj_num |
21-484 |
| bldg_name |
Simms Road |
| proj_desc |
Natural Gas Line Replacement between HC Morgan Dr & Sugg Lab |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
130365.00 |
| total_funding |
NULL |
| proj_system |
NATURAL GAS DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 182 |
| rnr_id |
838 |
| fiscal_year |
FY22 |
| proj_num |
21-486 |
| bldg_name |
Donahue Drive & Auburn Research Park |
| proj_desc |
Domestic Water System Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
126340.00 |
| total_funding |
NULL |
| proj_system |
DOMESTIC WATER DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 183 |
| rnr_id |
839 |
| fiscal_year |
FY22 |
| proj_num |
21-510 |
| bldg_name |
Campus Wide - Maintenance |
| proj_desc |
ANNUAL RESERVE - Access Control Panel Upgrades Throughout AU Main Campus (ref 17-333 for FY19) - PHASE III |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
(10/18/2016) Added at Burl Sumlin's request - total of all phases estimated at $321k. (04/14/2017) Per Burl, alloc reduced from $75k to $50k. |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 184 |
| rnr_id |
840 |
| fiscal_year |
FY22 |
| proj_num |
21-514 |
| bldg_name |
Parkerson Mill Creek |
| proj_desc |
Parkerson Mill Creek - Greenway Phase III (Lem Morrision Drive to VCOM Pond |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
110950.00 |
| total_funding |
NULL |
| proj_system |
SITE |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 185 |
| rnr_id |
841 |
| fiscal_year |
FY22 |
| proj_num |
21-521 |
| bldg_name |
Ingram Hall |
| proj_desc |
Fencing Improvements for HVAC Equipment Enclosure |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
61000.00 |
| total_funding |
NULL |
| proj_system |
SITE |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 186 |
| rnr_id |
842 |
| fiscal_year |
FY22 |
| proj_num |
21-523 |
| bldg_name |
Campus Wide - Landscape Services |
| proj_desc |
ANNUAL RESERVE - Various Small LANDSCAPE, Tree Preservation, and Irrigation Improvement Efforts - FY22 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
200000.00 |
| total_funding |
NULL |
| proj_system |
LANDSCAPING |
| fac_dept |
FO - Landscape |
| fm_overall_rank |
NULL |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 187 |
| rnr_id |
843 |
| fiscal_year |
FY22 |
| proj_num |
21-524 |
| bldg_name |
Melton Student Center |
| proj_desc |
New Entrance Mats & Carpet Replacement For Multiple Suites |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
219305.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 188 |
| rnr_id |
844 |
| fiscal_year |
FY22 |
| proj_num |
21-526 |
| bldg_name |
Greene Hall |
| proj_desc |
Suite 301, Restroom Renovations |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
250000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 189 |
| rnr_id |
845 |
| fiscal_year |
FY22 |
| proj_num |
21-541 |
| bldg_name |
Logicore Building - Huntsville |
| proj_desc |
Acquisistion Study |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
STUDY |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 190 |
| rnr_id |
846 |
| fiscal_year |
FY22 |
| proj_num |
21-548 |
| bldg_name |
President's House |
| proj_desc |
Install covers on all chimneys |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
51200.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 191 |
| rnr_id |
847 |
| fiscal_year |
FY22 |
| proj_num |
21-552 |
| bldg_name |
Mullins Property |
| proj_desc |
Building Demolition & Landscape Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
65000.00 |
| total_funding |
NULL |
| proj_system |
DEMOLITIONS |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 192 |
| rnr_id |
848 |
| fiscal_year |
FY22 |
| proj_num |
21-556 |
| bldg_name |
Peet Theatre & Goodwin Hall |
| proj_desc |
[UE169] New Transformers and Electrical Service Upgrades |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
450000.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL DISTRIBUTION SYSTEM |
| fac_dept |
FO - Utilities and Energy |
| fm_overall_rank |
NULL |
| rank_by_direct |
10.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
[6/1/2020] loaded from U&E list |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 193 |
| rnr_id |
849 |
| fiscal_year |
FY22 |
| proj_num |
21-557 |
| bldg_name |
Bull Testing Facility |
| proj_desc |
[UE105] Repair or replace sewer line from Bull Testing area up to Gilmer-Turnham building - part of the line is an aerial line. Engineering assessment and design needed to determine full scope of work. |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
326250.00 |
| total_funding |
NULL |
| proj_system |
SANITARY SEWER SYSTEM |
| fac_dept |
FO - Utilities and Energy |
| fm_overall_rank |
NULL |
| rank_by_direct |
3.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
There are known past issues with the sewer line in this area. 8-31-17 Engage Krebs to give us price. 11-10-17 Estimate received from Krebs for $186,000 construction cost. Price marked up 40% for Facilities charges. |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 194 |
| rnr_id |
850 |
| fiscal_year |
FY22 |
| proj_num |
21-558 |
| bldg_name |
District Energy Plant |
| proj_desc |
[UE23] Provide an Emergency Generator - CONSTRUCTION PORTION ONLY |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
242000.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL |
| fac_dept |
FO - Utilities and Energy |
| fm_overall_rank |
NULL |
| rank_by_direct |
4.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
No emergency power at DEP now. (05/04/2016) Per Ken Martin, lowered from $360k to $100k. (02/27/2018) Per Mark A. Remaining $85k allocation increased from $85k to $200k. (05/24/2018) $200k to $210k. |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 195 |
| rnr_id |
851 |
| fiscal_year |
FY22 |
| proj_num |
21-559 |
| bldg_name |
Haley Center |
| proj_desc |
Bldg-Wide - Fire Alarm System Upgrades (backbone through 10-042) - PHASE II ONLY (devices & mass notification. sys.) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
655000.00 |
| total_funding |
NULL |
| proj_system |
FIRE PROTECTION |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
5.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
backbone system funded through 10-042. This portion is for devices only, and will include asbestos abatements. (Work to Be Performed in FY 15) |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 196 |
| rnr_id |
852 |
| fiscal_year |
FY22 |
| proj_num |
21-560 |
| bldg_name |
Haley Center |
| proj_desc |
Motor Control Centers (MCC) Replacement (ref 17-158 for study) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
300000.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
3.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
(08/01/2017) Added per Eric Moore and Mark Aderholdt. Per Eric Moore, $250k increased to $185k; proposed for FY22.
|
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 197 |
| rnr_id |
853 |
| fiscal_year |
FY22 |
| proj_num |
21-561 |
| bldg_name |
Langdon Hall |
| proj_desc |
Building Envelope Restoration Phase III - Replace windows, repoint the brick, and tile patio (Ref. 19-163 for design work) Phase 2 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
350000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
.20 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 198 |
| rnr_id |
854 |
| fiscal_year |
FY22 |
| proj_num |
21-562 |
| bldg_name |
Draughon Library |
| proj_desc |
Roof Replacement & Building Envelope Sealant Repairs - Phase 1- CONSTRUCTION PORTION ONLY (Ref. 17-330) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
776500.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
7.00 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
(10/17/2017) Per Adam, reduced from $2M to 825k - 1/2 of roof under warranty. (12/07/2017) Per MA, $750k to $1.1M. (06/18/2018) Per MA, $1.1M to $1.3M. |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 199 |
| rnr_id |
855 |
| fiscal_year |
FY22 |
| proj_num |
21-563 |
| bldg_name |
Campus Wide - Maintenance |
| proj_desc |
ANNUAL RESERVE - Brick and Joint Pointing |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 200 |
| rnr_id |
856 |
| fiscal_year |
FY22 |
| proj_num |
21-596 |
| bldg_name |
CDV Extension Parking Lots |
| proj_desc |
Asphalt Pavement Rehabilitation and Repairs |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
45500.00 |
| total_funding |
NULL |
| proj_system |
PARKING LOT |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 201 |
| rnr_id |
857 |
| fiscal_year |
FY22 |
| proj_num |
21-599 |
| bldg_name |
Terrell Dining Hall |
| proj_desc |
Partial Roof Replacement - Special Events Portion |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100225.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 202 |
| rnr_id |
858 |
| fiscal_year |
FY22 |
| proj_num |
21-616 |
| bldg_name |
Wire Road & Shug Jordan |
| proj_desc |
Traffic Signal Mast Arm Replacement |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
59560.00 |
| total_funding |
NULL |
| proj_system |
TRAFFIC SIGNAL |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 203 |
| rnr_id |
859 |
| fiscal_year |
FY22 |
| proj_num |
22-006 |
| bldg_name |
Harbert Center |
| proj_desc |
Davis Hall & Harbert Center - Roof Membrane Replacement Under Pavers |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
ROOF |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 204 |
| rnr_id |
860 |
| fiscal_year |
FY22 |
| proj_num |
22-021 |
| bldg_name |
Campus Wide - Design & Construction |
| proj_desc |
ANNUAL RESERVE - Roadway Spot Repairs and Striping |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
ROADWAYS |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
.10 |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 205 |
| rnr_id |
861 |
| fiscal_year |
FY22 |
| proj_num |
22-022 |
| bldg_name |
Wire Road |
| proj_desc |
West Village Parking Driveway & Wire Rd - Sidewalk & Crosswalk Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
78000.00 |
| total_funding |
NULL |
| proj_system |
TRAFFIC SIGNAL |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 206 |
| rnr_id |
862 |
| fiscal_year |
FY22 |
| proj_num |
22-056 |
| bldg_name |
AU Hotel & Dixon Conference Center |
| proj_desc |
2nd Floor Water Damage Restoration Services |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
51700.00 |
| total_funding |
NULL |
| proj_system |
PLUMBING |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 207 |
| rnr_id |
863 |
| fiscal_year |
FY22 |
| proj_num |
22-057 |
| bldg_name |
AU Hotel & Dixon Conference Center |
| proj_desc |
Lobby, Water Damage Restoration Services |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
20000.00 |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 208 |
| rnr_id |
864 |
| fiscal_year |
FY22 |
| proj_num |
22-059 |
| bldg_name |
Corley Building |
| proj_desc |
Water Intrusion Damage Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
94000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 209 |
| rnr_id |
865 |
| fiscal_year |
FY22 |
| proj_num |
22-072 |
| bldg_name |
Samford Hall |
| proj_desc |
Room 107, Wall $ Chase Repair Due to to Water Damage |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
64000.00 |
| total_funding |
NULL |
| proj_system |
PLUMBING |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
NULL |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 210 |
| rnr_id |
866 |
| fiscal_year |
FY23 |
| proj_num |
23-052 |
| bldg_name |
Satellite Uplink Building |
| proj_desc |
Satellite Uplink Building - Radio Antenna Replacement and Infrastructure Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
124529.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
FO - Campus Services |
| fm_overall_rank |
104.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-18 08:12:31.000 |
| created_by |
hixjame |
| date_edited |
2023-04-27 16:02:55.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Radio antenna is used during Gameday by Police/Fire Department |
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
Safety |
|
| 211 |
| rnr_id |
867 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Horizontal Hardscape Cleaning |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
FO - Campus Services |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-18 11:02:33.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:06:55.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Campus Services would like to establish an Annual Reserve for pressure washing horizontal surfaces |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 212 |
| rnr_id |
868 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Building Signage - Refurbishments |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
PD+C - Campus Planning |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-18 11:11:53.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:17:37.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Campus Planning would like to establish an Annual Reserve to update building signage across campus. |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 213 |
| rnr_id |
869 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Hardscape Upgrades - Outdoor Benches, Tables, Chairs |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
25000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
PD+C - Campus Planning |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-18 11:15:05.000 |
| created_by |
hixjame |
| date_edited |
2023-04-18 11:17:45.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Campus Planning would like to initiate an Annual Reserve to update/replace benches, tables, chairs on campus |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 214 |
| rnr_id |
870 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Sidewalk |
| proj_desc |
Wire Rd Sidewalk from Samford to Lem Morrison |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
500000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-24 09:33:41.000 |
| created_by |
hixjame |
| date_edited |
2023-04-24 10:08:21.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Requested by Student Affairs |
| archive |
0 |
| exe_constraint |
None |
| classification |
Safety |
|
| 215 |
| rnr_id |
871 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Sidewalk |
| proj_desc |
W Magnolia Sidewalk - Widen Sidewalk from Wire/Magnolia intersection to Hemlock |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
750000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-24 09:37:20.000 |
| created_by |
hixjame |
| date_edited |
2023-04-24 10:08:27.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Requested by Student Affairs |
| archive |
0 |
| exe_constraint |
None |
| classification |
Safety |
|
| 216 |
| rnr_id |
872 |
| fiscal_year |
FY23 |
| proj_num |
23-138 |
| bldg_name |
Haley Center |
| proj_desc |
Paint and Flooring for classrooms |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
33.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-28 14:21:09.000 |
| created_by |
hixjame |
| date_edited |
2023-05-08 15:57:24.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
4/28/23 - Will used Annual Reserve funds reserved for Brick & Joint Repointing |
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
Asset Renewal |
|
| 217 |
| rnr_id |
873 |
| fiscal_year |
FY23 |
| proj_num |
22-434 |
| bldg_name |
President House |
| proj_desc |
President\\\\\\\'s House - Repair Shower Door & Marble Tile |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
6000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
68.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-28 15:45:50.000 |
| created_by |
hixjame |
| date_edited |
2023-05-02 11:42:15.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 218 |
| rnr_id |
874 |
| fiscal_year |
FY23 |
| proj_num |
22-546 |
| bldg_name |
Haley Center |
| proj_desc |
Haley Center - Suite 6030, Conference Room Expansion |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
36000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
69.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-28 15:47:36.000 |
| created_by |
hixjame |
| date_edited |
2023-05-02 11:42:40.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 219 |
| rnr_id |
875 |
| fiscal_year |
FY23 |
| proj_num |
22-357 |
| bldg_name |
Swingle Hall |
| proj_desc |
Swingle Hall - 2nd Floor Restroom, Renovate For ADA Compliance |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
1936.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
70.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-28 16:00:33.000 |
| created_by |
hixjame |
| date_edited |
2023-05-02 11:43:01.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Misc Small paid for Service Center time |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 220 |
| rnr_id |
876 |
| fiscal_year |
FY23 |
| proj_num |
23-086 |
| bldg_name |
Swingle Hall |
| proj_desc |
Swingle Hall - Rms 205 & 207, Add Women\\\\\\\'s Bathroom Fixtures |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
5500.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
71.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-28 16:03:56.000 |
| created_by |
hixjame |
| date_edited |
2023-05-02 11:43:21.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 221 |
| rnr_id |
877 |
| fiscal_year |
FY23 |
| proj_num |
23-175 |
| bldg_name |
Greene Hall |
| proj_desc |
Greene Hall - Suite 180, Structural Investigation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
7500.00 |
| total_funding |
NULL |
| proj_system |
STRUCTURE |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
72.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-28 16:05:32.000 |
| created_by |
hixjame |
| date_edited |
2023-05-02 11:43:44.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Safety |
|
| 222 |
| rnr_id |
878 |
| fiscal_year |
FY23 |
| proj_num |
23-078 |
| bldg_name |
Smith Hall, M.W. |
| proj_desc |
M.W. Smith Hall - Rm 215, Add Walls |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
9287.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
73.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-28 16:08:01.000 |
| created_by |
hixjame |
| date_edited |
2023-05-02 11:44:02.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 223 |
| rnr_id |
879 |
| fiscal_year |
FY23 |
| proj_num |
23-060 |
| bldg_name |
Chemistry Building |
| proj_desc |
Chemistry Building - Rm 216, Remove Fume Hood |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
5000.00 |
| total_funding |
NULL |
| proj_system |
SAFETY |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
74.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-28 16:09:57.000 |
| created_by |
hixjame |
| date_edited |
2023-05-10 16:12:20.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Fume Hood Abatement |
| archive |
0 |
| exe_constraint |
None |
| classification |
Safety |
|
| 224 |
| rnr_id |
880 |
| fiscal_year |
FY23 |
| proj_num |
21-561 |
| bldg_name |
Langdon Hall |
| proj_desc |
Langdon Hall - Building Envelope Restoration (Phase III) |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
21000.00 |
| total_funding |
NULL |
| proj_system |
EXTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
75.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-04-28 16:12:14.000 |
| created_by |
hixjame |
| date_edited |
2023-05-02 11:44:45.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 225 |
| rnr_id |
882 |
| fiscal_year |
NULL |
| proj_num |
23-185 |
| bldg_name |
President House |
| proj_desc |
Evaluate & Correct Moisture Issues |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
11000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
CR - Admin |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-11 14:46:44.000 |
| created_by |
yonbenj |
| date_edited |
2023-05-11 14:48:30.000 |
| edited_by |
yonbenj |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 226 |
| rnr_id |
883 |
| fiscal_year |
FY23 |
| proj_num |
21-591 |
| bldg_name |
Forestry, Wildlife and Environment Building |
| proj_desc |
Provide charging stations for Suite 2217 |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
2500.00 |
| total_funding |
NULL |
| proj_system |
ELECTRICAL |
| fac_dept |
FO - In-House Construction |
| fm_overall_rank |
84.20 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-11 14:54:46.000 |
| created_by |
hixjame |
| date_edited |
2023-05-15 15:56:59.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Additional funding needed for unforeseen issues. |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 227 |
| rnr_id |
884 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
cw |
| proj_desc |
Emergency Reserve |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
1000000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-15 16:37:16.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:39:38.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
FY24 Emergency Reserve |
| archive |
0 |
| exe_constraint |
None |
| classification |
ER |
|
| 228 |
| rnr_id |
885 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Not Listed |
| proj_desc |
PPP Program |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
1000000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-15 16:38:33.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:40:00.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
FY24 PPP |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 229 |
| rnr_id |
886 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Bathroom Renovations |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:44:12.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:47:53.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 230 |
| rnr_id |
887 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Building Condition Assessments |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:46:09.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:47:59.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 231 |
| rnr_id |
888 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Landscape Services |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
200000.00 |
| total_funding |
NULL |
| proj_system |
LANDSCAPING |
| fac_dept |
FO - Landscape Services |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:48:03.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:53:03.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 232 |
| rnr_id |
889 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Access Control |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:48:59.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:53:08.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 233 |
| rnr_id |
890 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Backflow Preventer Testing & Repair |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
175000.00 |
| total_funding |
NULL |
| proj_system |
PLUMBING |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:50:38.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:53:12.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 234 |
| rnr_id |
891 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Painting |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
175000.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:51:40.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 08:53:16.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 235 |
| rnr_id |
892 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Building Pressure Washing |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
150000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:53:29.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 09:54:39.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 236 |
| rnr_id |
893 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Brick & Joint Repointing |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:54:21.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 09:54:45.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 237 |
| rnr_id |
894 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Elevator Upgrades |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
150000.00 |
| total_funding |
NULL |
| proj_system |
CONVEYANCE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:56:20.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 09:54:50.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 238 |
| rnr_id |
895 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Fall Protection Inspection |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
25000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:57:05.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 09:54:54.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 239 |
| rnr_id |
896 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Road |
| proj_desc |
Roadway Striping |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
ROADWAY |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 08:57:56.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 09:55:11.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 240 |
| rnr_id |
897 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Building Commissioning |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
75000.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Utilities and Energy Mgmt |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 09:51:05.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 09:54:58.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 241 |
| rnr_id |
898 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
SGA Projects |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 09:52:14.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 09:55:01.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 242 |
| rnr_id |
899 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Guardrail/Handrail Improvements |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
50000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-16 09:53:16.000 |
| created_by |
hixjame |
| date_edited |
2023-05-16 09:55:07.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 243 |
| rnr_id |
900 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Road |
| proj_desc |
Hemlock Drive Repaving |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
250000.00 |
| total_funding |
NULL |
| proj_system |
ROADWAY |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-18 12:57:46.000 |
| created_by |
hixjame |
| date_edited |
2023-05-18 13:00:07.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Repave portion of road from Thach to Magnolia |
| archive |
0 |
| exe_constraint |
None |
| classification |
Safety |
|
| 244 |
| rnr_id |
901 |
| fiscal_year |
FY23 |
| proj_num |
23-161 |
| bldg_name |
Martin Hall |
| proj_desc |
Rooms 209 & 210, Replace Carpet |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
21473.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
84.30 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-22 15:01:08.000 |
| created_by |
yonbenj |
| date_edited |
2023-06-12 09:57:04.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 245 |
| rnr_id |
902 |
| fiscal_year |
FY23 |
| proj_num |
23-104 |
| bldg_name |
Cater Hall |
| proj_desc |
2nd Floor Create Private Office |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
11000.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
PD+C - Non-Capital Projects |
| fm_overall_rank |
84.40 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-22 15:22:30.000 |
| created_by |
yonbenj |
| date_edited |
2023-06-28 14:01:51.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
Asset Renewal |
|
| 246 |
| rnr_id |
903 |
| fiscal_year |
FY24 |
| proj_num |
NULL |
| bldg_name |
Campus Wide |
| proj_desc |
Asbestos Abatement |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
100000.00 |
| total_funding |
NULL |
| proj_system |
SAFETY |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-05-23 14:05:32.000 |
| created_by |
hixjame |
| date_edited |
2023-05-23 14:07:11.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
New AR for abatement |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 247 |
| rnr_id |
904 |
| fiscal_year |
FY23 |
| proj_num |
23-268 |
| bldg_name |
Haley Center |
| proj_desc |
Room 3233, New Carpet |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
25300.00 |
| total_funding |
NULL |
| proj_system |
INTERIOR FINISHES |
| fac_dept |
FO - In-House Construction |
| fm_overall_rank |
84.50 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-01 15:56:43.000 |
| created_by |
yonbenj |
| date_edited |
2023-06-12 09:58:28.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
Asset Renewal |
|
| 248 |
| rnr_id |
905 |
| fiscal_year |
FY23 |
| proj_num |
23-047 |
| bldg_name |
Not Listed |
| proj_desc |
CADC Rural Studio Evaluation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
19700.00 |
| total_funding |
NULL |
| proj_system |
STRUCTURE |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
11.20 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-12 09:49:53.000 |
| created_by |
hixjame |
| date_edited |
2023-06-12 09:52:36.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Funds allocated to evaluate structural integrity of building |
| archive |
0 |
| exe_constraint |
None |
| classification |
ER |
|
| 249 |
| rnr_id |
906 |
| fiscal_year |
FY23 |
| proj_num |
23-122 |
| bldg_name |
Athletics Complex |
| proj_desc |
Seal Parking Lot |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
6000.00 |
| total_funding |
NULL |
| proj_system |
PARKING LOT |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
84.10 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-12 09:53:58.000 |
| created_by |
hixjame |
| date_edited |
2023-06-28 14:01:35.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Repair entrance to parking deck |
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
Asset Renewal |
|
| 250 |
| rnr_id |
907 |
| fiscal_year |
FY23 |
| proj_num |
22-371 |
| bldg_name |
Peet Theatre |
| proj_desc |
Waterproof Wall |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
23000.00 |
| total_funding |
NULL |
| proj_system |
BUILDING ENVELOPE |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
84.60 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-12 09:58:49.000 |
| created_by |
hixjame |
| date_edited |
2023-06-12 10:01:35.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Water intrusion into building |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 251 |
| rnr_id |
909 |
| fiscal_year |
FY23 |
| proj_num |
23-158 |
| bldg_name |
Draughon Village Laundry |
| proj_desc |
Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
6460.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
84.80 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-12 10:05:11.000 |
| created_by |
hixjame |
| date_edited |
2023-06-12 10:07:24.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 252 |
| rnr_id |
910 |
| fiscal_year |
FY23 |
| proj_num |
22-539 |
| bldg_name |
Haley Center |
| proj_desc |
Renovate Rooms |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
500.00 |
| total_funding |
NULL |
| proj_system |
DEMOLITIONS |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
84.90 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-12 10:07:44.000 |
| created_by |
hixjame |
| date_edited |
2023-06-12 10:09:35.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
Asset Renewal |
|
| 253 |
| rnr_id |
911 |
| fiscal_year |
FY23 |
| proj_num |
22-451 |
| bldg_name |
Campus Wide |
| proj_desc |
Signage Implementation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
10000.00 |
| total_funding |
NULL |
| proj_system |
UNCLASSIFIED SPECIAL PROJECT |
| fac_dept |
PD+C - Campus Planning |
| fm_overall_rank |
95.50 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-12 10:09:47.000 |
| created_by |
hixjame |
| date_edited |
2023-06-12 10:12:19.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
AR |
|
| 254 |
| rnr_id |
912 |
| fiscal_year |
FY23 |
| proj_num |
19-426 |
| bldg_name |
Lowder Hall |
| proj_desc |
Building Wide Fire Protection |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
12375.00 |
| total_funding |
NULL |
| proj_system |
FIRE PROTECTION |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
85.00 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-23 14:29:04.000 |
| created_by |
hixjame |
| date_edited |
2023-06-23 15:03:34.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Fee for unpaid consultant contract |
| archive |
0 |
| exe_constraint |
None |
| classification |
Safety |
|
| 255 |
| rnr_id |
913 |
| fiscal_year |
FY23 |
| proj_num |
23-159 |
| bldg_name |
Lowder Hall |
| proj_desc |
Room 024 Renovation |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
44250.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
CR - University Engineer |
| fm_overall_rank |
48.20 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-23 14:39:20.000 |
| created_by |
hixjame |
| date_edited |
2023-06-23 14:42:38.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
PPP Program |
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
PPP |
|
| 256 |
| rnr_id |
914 |
| fiscal_year |
FY23 |
| proj_num |
23-232 |
| bldg_name |
Not Listed |
| proj_desc |
South Quad Parking Deck Heat Pump |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
17820.00 |
| total_funding |
NULL |
| proj_system |
HVAC |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
85.30 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
5-10 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-23 14:45:24.000 |
| created_by |
hixjame |
| date_edited |
2023-06-23 14:52:36.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 257 |
| rnr_id |
915 |
| fiscal_year |
FY23 |
| proj_num |
23-305 |
| bldg_name |
Thach Hall |
| proj_desc |
Thach & Tichenor Clean Exterior |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
25870.00 |
| total_funding |
NULL |
| proj_system |
EXTERIOR FINISHES |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
31.10 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
3-5 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-23 14:52:54.000 |
| created_by |
hixjame |
| date_edited |
2023-06-23 14:55:50.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
Summer Critical |
| classification |
AR |
|
| 258 |
| rnr_id |
916 |
| fiscal_year |
FY23 |
| proj_num |
23-302 |
| bldg_name |
Not Listed |
| proj_desc |
AU Regional Airport - South Ramp, Safety Study |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
6500.00 |
| total_funding |
NULL |
| proj_system |
STUDY |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
84.70 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
0-2 |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-26 08:43:26.000 |
| created_by |
hixjame |
| date_edited |
2023-06-26 08:45:50.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
DK requested for R&R to pay |
| archive |
0 |
| exe_constraint |
None |
| classification |
Safety |
|
| 259 |
| rnr_id |
917 |
| fiscal_year |
FY23 |
| proj_num |
23-358 |
| bldg_name |
Road |
| proj_desc |
Donahue Traffic Signal Upgrade |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
60000.00 |
| total_funding |
NULL |
| proj_system |
TRAFFIC SIGNAL |
| fac_dept |
PD+C - Capital Projects |
| fm_overall_rank |
115.10 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-26 08:59:10.000 |
| created_by |
hixjame |
| date_edited |
2023-06-26 09:02:04.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Partner with City of Auburn to coordinate traffic signals on Donahue drive |
| archive |
0 |
| exe_constraint |
None |
| classification |
Campus Upgrade |
|
| 260 |
| rnr_id |
918 |
| fiscal_year |
FY23 |
| proj_num |
23-338 |
| bldg_name |
Walker Building |
| proj_desc |
Walker Pharmacy Bldg - Replace Chilled Water Pump |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
30000.00 |
| total_funding |
NULL |
| proj_system |
CHILLED WATER DISTRIBUTION SYSTEM |
| fac_dept |
FO - Maintenance |
| fm_overall_rank |
83.10 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-28 13:58:36.000 |
| created_by |
hixjame |
| date_edited |
2023-06-28 14:00:53.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Installation of CHW pump |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 261 |
| rnr_id |
919 |
| fiscal_year |
FY23 |
| proj_num |
21-492 |
| bldg_name |
Chapel |
| proj_desc |
Chapel Interior Renovations |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
10057.00 |
| total_funding |
NULL |
| proj_system |
RENOVATION |
| fac_dept |
FO - In-House Construction |
| fm_overall_rank |
83.20 |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
10+ |
| priority |
1 |
| proj_champ |
NULL |
| date_created |
2023-06-29 08:04:30.000 |
| created_by |
hixjame |
| date_edited |
2023-06-29 08:07:10.000 |
| edited_by |
hixjame |
| funding_status |
NULL |
| notes |
Budget change for IHC overrun |
| archive |
0 |
| exe_constraint |
None |
| classification |
Asset Renewal |
|
| 262 |
| rnr_id |
920 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 263 |
| rnr_id |
921 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 264 |
| rnr_id |
922 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 265 |
| rnr_id |
923 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 266 |
| rnr_id |
924 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 267 |
| rnr_id |
925 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 268 |
| rnr_id |
926 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 269 |
| rnr_id |
927 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 270 |
| rnr_id |
928 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 271 |
| rnr_id |
929 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 272 |
| rnr_id |
930 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 273 |
| rnr_id |
931 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 274 |
| rnr_id |
932 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|
| 275 |
| rnr_id |
933 |
| fiscal_year |
NULL |
| proj_num |
NULL |
| bldg_name |
NULL |
| proj_desc |
NULL |
| design_constr |
NULL |
| prev_funded |
NULL |
| future_fund |
NULL |
| total_funding |
NULL |
| proj_system |
NULL |
| fac_dept |
NULL |
| fm_overall_rank |
NULL |
| rank_by_direct |
NULL |
| system_rank |
NULL |
| system_fci |
NULL |
| est_useful_life |
NULL |
| priority |
NULL |
| proj_champ |
NULL |
| date_created |
NULL |
| created_by |
NULL |
| date_edited |
NULL |
| edited_by |
NULL |
| funding_status |
NULL |
| notes |
NULL |
| archive |
0 |
| exe_constraint |
NULL |
| classification |
NULL |
|